V2.01
25359_EDEBD
A0279-2320-1_EN
21
Commissioning
If a capacitive value is displayed, or if the "G" symbol is flashing, the phase allocation of
the current and voltage measurement is incorrect. In the Commissioning programming
menu, the phase allocation can be changed using the functions Rot. field U and Rot.
field I (provided that there is no generator in operation at the time).
The first switching operation may take up to 180 seconds. The stages are switched in set
intervals until compensation occurs. The displayed cos phi must increase to at least the
set target cos phi.
Содержание multicomp F144-MS-1V1C1TI6RO-3
Страница 65: ...Notes 25359_EDEBDA0279 2320 1_EN 65...
Страница 66: ...Notes 25359_EDEBDA0279 2320 1_EN 66...
Страница 67: ...Notes 25359_EDEBDA0279 2320 1_EN 67...