17
DANGER
Risk of explosion in case of gas leakage due to improper instal-
lation! Only authorised installation companies (VIU) under con-
tract to the gas supply companies (GVU) are permitted.
The installation companies authorised for installing or modify-
ing gas plants must provide the following details to the gas
supply company before starting installation work:
– Type and scope of the proposed plant.
– Proposed construction measures.
The contracted installation company shall confirm with the
gas supply company that there will be adequate gas supply to
the plant.
Gas supply pipe requirements:
– The pipes should be short and straight, as far as possible.
– It should have a nominal width greater than the nominal width
of the burner fittings.
– It should have corrosion protection.
For pipes inside the building and in the open, it is recommend-
ed to do a preliminary and main test with air or inert gas (not
oxygen):
– Preliminary testing: Without fittings, with an excess pressure
of 0.1 MPa.
– Main testing: Entire pipe plant from the main cock to the stop-
valve at the burner with closed solenoid valves and an oper-
ating pressure of 1.1 times and a minimum excess pressure
of 0.005 MPa (50 mbar).
– Apply a coat of foaming agent at the joints; ensure that the
foaming agent is a non-corrosive one.
DANGER
Risk of explosion in case of gas leakage! Do not use leaky pipes.
Get the start up or commissioning testing done by an author-
ised agent according to the national requirements of the
country of installation.
Rinse the firmly installed water pipes at the installation site.
Establish electrical connections according to the technical
data or details on the type plate.
Inspect the plant and find out the answers to the following
questions:
– Is the entire high pressure unit connected properly?
– Are all joints leak-proof?
– Is the decalcification unit ready for operation?
– Is there adequate water supply and is the water temperature
within permissible limits?
– Is the rotating direction of the burner motor (see direction ar-
row on the casing) OK?
– Are the temperature settings on the thermostats "hot water“
and "steam stage“ OK?
– Are the overflow pipes for the swimmer tank and the safety
valve "high pressure outlet" connected properly?
Release safety and controlling mechanisms (safety tempera-
ture stop, exhaust temperature stop).
Gas installation
Measures to be taken before start-up
Installation certification / Startup testing
Plant type:
Manufact. no.:
Start-up on:
Certification:
The plant has been properly installed by
(Name, Address):
Signature/ Date
Signature of the approved monitoring agency/ date
39
EN
Содержание HWE 4000 Gas
Страница 2: ...2...
Страница 13: ...11 Ma blatt c Brennkammer ausziehen d Kesselmantel abnehmen 13 DE...
Страница 33: ...11 Specifications sheet c Pull out the burner chamber d Remove the boiler sleeve 33 EN...
Страница 53: ...11 Feuille de mesure c Sortir la chambre de br leur d Enlever le manteau de chaudi re 53 FR...
Страница 73: ...11 Hoja de dimensiones c Extraer la c mara de combusti n d Extraer la camisa de la caldera 73 ES...
Страница 93: ...11 M ttblad c Dra ut br nnkammare d Ta av beh llarens mantel 93 SV...
Страница 105: ...3 1800 l h 1 1 2 MPa 1 4 MPa HDI 38 12 1 6 MPa 6 412 271 0 105 EL...
Страница 107: ...5 S1 P1 P2 M M1 1 16 27 A M30x1 5 B M30x1 5 C 20 mm 3x1 5 mm2 12x1 mm2 A B C 7 8 28 12 11 9 107 EL...
Страница 110: ...8 ON Not Aus 95 C 10 10 tmax 100 C 10 2 MPa 80 C 110 EL...
Страница 113: ...11 c d 113 EL...
Страница 114: ...12 K rcher 30 10 dH 120 750 10 114 EL...
Страница 115: ...13 K rcher RM 100 6 287 008 RM 101 6 287 013 RM 100 HWE 4000 20 RM 81 5 115 EL...
Страница 118: ...16 DGRL 97 23 E IEC 60364 1 1x 10A EN 12729 BA 40 C 118 EL...
Страница 119: ...17 VIU GVU 0 1 MPa 1 1 0 005 MPa 50 mbar 119 EL...
Страница 120: ...18 120 EL...
Страница 125: ...3 1500 1 1 2 1 4 HDI 38 12 1 6 6 412 271 0 125 RU...
Страница 127: ...5 S1 P1 P2 M M1 1 16 27 A M30x1 5 B M30x1 5 C 20 3x1 5 2 12x1 2 A B C 7 8 28 12 11 9 127 RU...
Страница 130: ...8 95 C 10 10 1 t 100 C 10 2 80 C 130 RU...
Страница 133: ...11 c d 133 RU...
Страница 134: ...12 30 10 dH 120 750 10 134 RU...
Страница 135: ...13 Karcher RM 100 6 287 008 RM 101 6 287 013 RM 100 HWE 4000 20 RM 81 5 135 RU...
Страница 138: ...16 DGRL 97 23 EG IEC 60364 1 1x 10A EN 12729 BA 40 C 138 RU...
Страница 139: ...17 VIU GVU 0 1 1 1 0 005 50 139 RU...
Страница 140: ...18 140 RU...
Страница 153: ...11 M ret lap c g skamr t kih zni d Kaz nburkolatot levenni 153 HU...
Страница 173: ...11 P ehled rozm r c Vyta en spalovac komory d Sejmut pl t kotle 173 CS...
Страница 193: ...11 Arkusz z wymiarami c Wyj komor spalania d Zdemontowa p aszcz kot a 193 PL...
Страница 203: ......
Страница 204: ...http www kaercher com dealersearch...