background image




2. Installation

Please establish to the horizontal position.
Please refer to the figure of the right about the
around of inclination. And, please establish to
the horizontal position about the right and left.
Please fix it firmly as occasion demands.
Place where can not establish

Place where back is stuck to wall etc.

Place where height is more than 1000m

Outdoor, and place where is exposed to the storm

Place where acid and corrosiveness gas is floating   

Places of there are many dust

Room where is tightly sealed and case inside

Place where has vibration

Upper part of generation thing

Place where ambient temp. is more than 0 - +40

C.

Neighborhood of combustible

Place where ambient humidity is more than 85%R.H.

Place where air pressure is low

Place where has floating objects that pass electricity (Carbon fiber etc.)

3. Piping

Please fix the piping to the outlet and inlet certainly.

Leakage of the hot-air is occurred without fail on the characteristic of the flexible
hose in the case of the piping by the flexible hose to the outlet and inlet of hot-air
generator. Electron devices inside the operation panel are damaged by the hot-air
of the high temp. that leaked flows backward to the hot-air generator inside. So,
please execute the glass tape for the air leakage prevention that was enclosed to the
outlet and inlet.

Please pipe as thickly, short, and gradual curve as possible.
Please insulate sufficiently without fail to piping.

Please do not hang the pulling load to the outlet flange in the condition that the hot-
air generator with the outlet flange was fixed.

Execution example of the glass tape for
the air leakage prevention

Please do not insert the piping is smaller than the bore of the outlet to the outlet. Outlet sensor is bent, and
the sensor contacts to the heater.

4. Power supply

Please ask the connection of the power supply and ground construction work to the electric repairing work
technician.
Please connect the power cord in accordance with R(Red), S(White), T(Black), and Ground(Green).

Power cord is not belonged TSK-121. So, please prepare separately.(Recommendation cord : Cab tire cable 100mm

2

)

Please use the commercial power supply (50/60Hz) that has the sine wave-like to the power supply of the
hot-air generator. Please do not use the power supply that has the distortion wave including a high tone
wave from the frequency transformation device absolutely.
Please establish the exclusive use circuit. Please decide the capacity of the sensitivity current in accordance
with the following table in the case that the electric leakage circuit breaker is attached.

Model

Rough standard of the sensitivity current of the electric leakage circuit

TSK-18, 23, 33

50mA

TSK-42, 52, 52HT, 56

50mA

TSK -62, 72, 82

100mA

TSK-92, 102, 122, 132

200mA

* About 10 times of the early period leakage current are general as the sensitivity current of the electric leakage circuit breaker.

Please supply the power supply that the rating frequency that has the sine wave wave-like without fail was secured when the generator is
used to the power supply of the hot-air generator. Temp. is not controlled normally and the operation may not produced if the power
supply that rating frequency is not secured is supplied.

Please execute the ground construction work to prevent electric shock accident prevention. (Less than 300V
: D-class ground  Less than 600V : C-class ground)

Attention

The voltage depression is occurred by too long wiring. So, please pay attention.

Attention

Please block the power supply without fail at the time of wiring and inspection. Please block the factory power supply without
fail because electricity is flowing to the control circuit even if the breaker (NFB) of the hot-air generator is turned OFF. You
receive an electric shock when work is conducted in the condition that the power supply is turned ON.

Attention

Please secure sufficient capacity in the case that the socket was established for connection. Socket may cause contact
defectiveness, absence phase, generation, and malfunction by passing year change. So, please refrain from the use of the
socket.

Attention

Hot-air generator is the device that is used in industry environment mainly. Radio wave obstacle may occur if this is used in
residence environment. User of this product must take the appropriate means for obstacle reduction.

-2-

15°

10°

Содержание TSK-23

Страница 1: ...nges this operation manual without taking our permission TSK 122 132 TSK 92 102 Operation manual Total edition Please read without fail before use Thank you very much for purchasing Hot air generator...

Страница 2: ...that was enclosed to the outlet and inlet Input terminal A1 A10 and output terminal B8 B10 is malfunctioned by the voltage is applied And output terminal B1 B7 is malfunctioned by the voltage more tha...

Страница 3: ...epare separately Recommendation cord Cab tire cable 100mm 2 Please use the commercial power supply 50 60Hz that has the sine wave like to the power supply of the hot air generator Please do not use th...

Страница 4: ...s by the temp of storage atmosphere drops in the winter season Hot air generator becomes freezing condition if this machine is stored in the condition that the condensation occurred and it becomes the...

Страница 5: ...N switch This is lighted when the operation condition was changed to the external sensor Hot air generator is operated with the external operation signal and external heater ON OFF signal by the switc...

Страница 6: ...ouple JISK Heatproof blower Hot air circulation type Breaker NFB Control panel Service terminal Eye bolt Hot air outlet Outlet temp sensor Thermocouple JISK Heatproof blower Hot air circulation type w...

Страница 7: ...and external heater input terminal E H is less than DC12V 3 6mA Please prepare the relay that has the contact capacity that can open and close this voltage Please change the external operation mode b...

Страница 8: ...case that the remote controller of the option is used For communication of the remote Please input DC4 20mA only TSK 122 and 132 4mA Heater output 0 20mA Heater output 100 Output terminal M3 20P The...

Страница 9: ...emp detection OFF OFF OFF OFF OFF OFF External sensor burnout OFF TSK 52HT 62 72 82 92 102 122 132 Action of the hot air generator Blow output Hot air output Temp warning Temp alarm Blower warning Ove...

Страница 10: ...f this machine are turned OFF at first and are turned ON again after cooling sufficiently TSK 18 is only input of the factory power supply At the time of overheat sensor burnout Overheat lamp Red are...

Страница 11: ...ter cooling sufficiently TSK 18 is only input of the factory power supply When the inlet temp exceeded the upper limit TEMP WARN lamp Red is lighted and present temp is lighted to HOT AIR TEMP Tcc is...

Страница 12: ...the time of the furnace upper part establishment Return method Please stop operation by pushing STOP switch And please disarm by turning OFF the breaker NFB of this machine after inside temp of the h...

Страница 13: ...s are confirmed And please communicate the display contents The position of the inverter panel differs by the machine type TSK 18 Back side of the control panel service terminal TSK 23 33 The inside o...

Страница 14: ...out fail when the wiring is confirmed and readjusted at the time of abnormal 8 4 Other warning Frequency warning Only TSK 52HT TSK 62 132 SYS is flickered to HOT AIR TEMP ALM to SETTING TEMP in the ca...

Страница 15: ...air generator is stopped at the time of the reverse connection of each temp sensor External sensor is included or perception of 15 C Only inside temp sensor is 10 C is flickered to HOT AIR TEMP displa...

Страница 16: ...sales kansaidennetsu co jp Inquiry regarding the hot air generator Homepage www kansaidennetsu co jp or E mail...

Отзывы: