•
Leave at least 6 in. (15.2 cm) clearance on the left of the chassis for installing the grounding lug.
•
Leave at least 24 in. (61 cm) clearance in front of and behind the switch for service personnel to remove
and install hardware components.
Figure 35: QFX5120-48Y Switch - Clearance Requirements for Airflow and Hardware Maintenance
If you’re installing a QFX5120-32C Switch, note that the dimensions for the grounding lug are different
(see
. The dimensions are as follows:
•
Grounding wire- 14 AWG
•
Lug- 4.3 mm Circular Lug
•
Screw- 8mm screw used for tightening the Lug
72
Содержание QFX5120 Series
Страница 1: ...QFX5120 Switch Hardware Guide Published 2019 10 15 ...
Страница 18: ......
Страница 62: ......
Страница 87: ......
Страница 116: ......
Страница 138: ...5 CHAPTER Troubleshooting Hardware Troubleshooting QFX5120 Components 145 ...
Страница 139: ......
Страница 145: ......
Страница 163: ...Restricted Access Warning 169 ...
Страница 178: ...Jewelry Removal Warning 184 ...
Страница 181: ...Operating Temperature Warning 187 ...
Страница 190: ...DC Power Disconnection Warning 196 ...
Страница 194: ...DC Power Wiring Sequence Warning 200 ...
Страница 197: ...DC Power Wiring Terminations Warning 203 ...