
Table 24: Site Preparation Checklist (continued)
Date
Performed by
For More Information
Item or Task
Cables
Acquire cables and connectors:
•
Determine the number of cables needed
based on your planned configuration.
•
Review the maximum distance allowed
for each cable. Choose the length of the
cable based on the distance between the
hardware components being connected.
Plan the cable routing and management.
QFX5120 Site Guidelines and Requirements
IN THIS SECTION
Environmental Requirements and Specifications for QFX5120 Switches | 66
Site Electrical Wiring Guidelines | 68
Rack Requirements for QFX5120 Switches | 69
Cabinet Requirements for QFX5120 Switches | 70
Clearance Requirements for Airflow and Hardware Maintenance for QFX5120 Switches | 71
Environmental Requirements and Specifications for QFX5120 Switches
The switch must be installed in a rack or cabinet. It must be housed in a dry, clean, well-ventilated, and
temperature-controlled environment.
66
Содержание QFX5120 Series
Страница 1: ...QFX5120 Switch Hardware Guide Published 2019 10 15 ...
Страница 18: ......
Страница 62: ......
Страница 87: ......
Страница 116: ......
Страница 138: ...5 CHAPTER Troubleshooting Hardware Troubleshooting QFX5120 Components 145 ...
Страница 139: ......
Страница 145: ......
Страница 163: ...Restricted Access Warning 169 ...
Страница 178: ...Jewelry Removal Warning 184 ...
Страница 181: ...Operating Temperature Warning 187 ...
Страница 190: ...DC Power Disconnection Warning 196 ...
Страница 194: ...DC Power Wiring Sequence Warning 200 ...
Страница 197: ...DC Power Wiring Terminations Warning 203 ...