Site Preparation Checklist for QFX5120 Switches
The checklist in
summarizes the tasks you need to perform to prepare a site for
installing a QFX5120 switch.
Table 24: Site Preparation Checklist
Date
Performed by
For More Information
Item or Task
Environment
“Environmental Requirements and
Verify that environmental factors such as
temperature and humidity do not exceed
switch tolerances.
Power
Measure the distance between external
power sources and the switch installation
site.
Locate sites to connect system grounding.
•
•
Calculate the power consumption and
requirements.
Hardware Configuration
Choose the number and types of switches
you want to install.
Rack or Cabinet
•
Verify that the rack meets the minimum
requirements for installing the switch.
Plan rack or cabinet location, including
required space clearances.
Secure the rack or cabinet to the floor and
building structure.
65
Содержание QFX5120 Series
Страница 1: ...QFX5120 Switch Hardware Guide Published 2019 10 15 ...
Страница 18: ......
Страница 62: ......
Страница 87: ......
Страница 116: ......
Страница 138: ...5 CHAPTER Troubleshooting Hardware Troubleshooting QFX5120 Components 145 ...
Страница 139: ......
Страница 145: ......
Страница 163: ...Restricted Access Warning 169 ...
Страница 178: ...Jewelry Removal Warning 184 ...
Страница 181: ...Operating Temperature Warning 187 ...
Страница 190: ...DC Power Disconnection Warning 196 ...
Страница 194: ...DC Power Wiring Sequence Warning 200 ...
Страница 197: ...DC Power Wiring Terminations Warning 203 ...