– 56 –
(40) Assembling the suction pipe
WARNING :
As the work is performed while the power is ON, never touch the switches other than the necessary
one so as to prevent accidents caused by the malfunction of switches.
Standard adjustment
Longitudinal direction as viewed
from operator's side
B
A
❹
❽
1mm
❹
❽
Lateral direction as viewed
from operator's side
❷
❻
❼
❸
❶
Waiting (initial) position of cylinder
Most advanced position of cylinder
❺
Содержание LK-1900B series
Страница 128: ... 114 4 Parts to which grease is applied 1 Work clamp foot lifter area 2 Wiper area Grease JUKI Grease A Grease ...
Страница 129: ... 115 3 Thread tension area 4 Thread trimmer area Grease Grease JUKI Grease A ...
Страница 130: ... 116 5 Feed area Grease Grease D ...
Страница 131: ... 117 6 Needle bar and main shaft area 7 Lower shaft area JUKI Grease A JUKI Grease A ...
Страница 132: ... 118 8 Needle thread clamp mechanism area For LK 1900BB 1903BB Grease ...
Страница 133: ... 119 9 LK 1901B relations Grease ...
Страница 134: ... 120 10 LK 1903B relations Grease ...
Страница 135: ... 121 11 LK 1900BB 1903BB relations JUKI Grease A ...
Страница 164: ... 150 4 Power supply circuit diagram Single phase SDC board MAIN board Light blue Orange Brown Yellow Red Black ...