– 11 –
Procedures of assembling
1. Mounting of the main shaft motor together with the coupling
1) Tighten the four motor setscrews
❹
. Then, tighten the two setscrews
❺
on the main shaft side of the
coupling
❷
.
2) The cords of the main shaft motor
❸
should be positioned in the lateral direction.
2. Incorporation of the coupling in the main shaft motor
1) Provide a clearance of 0.5 mm between the coupling
❷
and the main shaft motor
❸
.
2) Apply the No. 1 screw
❺
of the coupling
❷
to the shaft flat section of the main shaft motor
❸
, and
fix it.
3. Meshing of the coupling
1) Apply the setscrew
❻
(No. 1 screw) of the main shaft motor side to the section between the two set
-
screws
❺
of the main shaft, and get them meshed.
Содержание LK-1900B series
Страница 128: ... 114 4 Parts to which grease is applied 1 Work clamp foot lifter area 2 Wiper area Grease JUKI Grease A Grease ...
Страница 129: ... 115 3 Thread tension area 4 Thread trimmer area Grease Grease JUKI Grease A ...
Страница 130: ... 116 5 Feed area Grease Grease D ...
Страница 131: ... 117 6 Needle bar and main shaft area 7 Lower shaft area JUKI Grease A JUKI Grease A ...
Страница 132: ... 118 8 Needle thread clamp mechanism area For LK 1900BB 1903BB Grease ...
Страница 133: ... 119 9 LK 1901B relations Grease ...
Страница 134: ... 120 10 LK 1903B relations Grease ...
Страница 135: ... 121 11 LK 1900BB 1903BB relations JUKI Grease A ...
Страница 164: ... 150 4 Power supply circuit diagram Single phase SDC board MAIN board Light blue Orange Brown Yellow Red Black ...