viii
5.3.2.4 Interrogation .......................................................................................... 5-33
5.3.2.5 Long Range Messages ......................................................................... 5-35
5.3.3 Maintenance ............................................................................................ 5-37
5.3.3.1 Self Diagnosis ..................................................................................... 5-38
5.3.3.2 Communication Test ............................................................................. 5-41
5.3.3.3 AIS Alarm .............................................................................................. 5-42
5.3.3.4 Sensor Status ...................................................................................... 5-44
5.3.3.5 Event Log.............................................................................................. 5-45
5.3.3.6 Software Version ................................................................................... 5-45
5.3.4 Set up Menu ............................................................................................ 5-46
5.3.4.1 Display Setting of Date and Time (DATE&TIME) .................................. 5-47
5.3.4.2 My Controller ........................................................................................ 5-48
5.3.4.3 Regional Channel ................................................................................. 5-52
5.3.4.4 Power Reduction .................................................................................. 5-57
5.3.4.5 Registration of Group Ships (GROUP SHIP) ........................................ 5-57
5.3.4.6 Change of Channels and Transmission Power (CHANNEL/POWER) .. 5-59
5.3.4.7 Change Password (PASSWORD) ........................................................ 5-60
5.3.4.8 Display Style of Latitude and Longitude (POSN DISP SET) ................. 5-61
5.3.4.9 Indication of AIS SART test signal (SART TEST SET) .......................... 5-61
5.3.4.10 Long-Range Set .................................................................................. 5-61
5.3.4.11 Prohibition of Transmission (SILENT MODE) ..................................... 5-63
5.3.4.12 CCRP set ............................................................................................ 5-63
5.3.4.13 Initial Setting of Own Ship’s Heading Direction (NSK UNIT) ............... 5-64
5.4 Explanation of Graphic display ................................................................... 5-67
5.4.1 The Outline of Display ............................................................................. 5-67
5.4.2 Operation for Graphic display .................................................................. 5-67
5.4.3 Setting the Contents of Graphic Display .................................................. 5-68
5.4.3.1 Display the Setting Screen.................................................................... 5-68
5.4.3.2 Display Item Explanation ...................................................................... 5-68
5.4.3.3 Display .................................................................................................. 5-70
5.4.4 Selection of Other Ships ........................................................................ 5-71
5.4.5 Auto Range Setting .................................................................................. 5-71
6. MAINTENANCE AND INSPECTION ............................................................. 6-1
6.1 General Maintenance and Inspection ......................................................... 6-1
6.2 Periodic Inspection ...................................................................................... 6-2
6.2.1 Confirming the Own Ship's Information ...................................................... 6-2
6.2.2 Confirming the TRX Channel ..................................................................... 6-3
6.2.3 Confirming the Alarm Status ...................................................................... 6-3
6.2.4 Confirming the Conditions of the Sensors ................................................. 6-6
6.3 Trouble Shootings ......................................................................................... 6-7
6.3.1 Trouble Shootings ...................................................................................... 6-7
6.3.2 Maintenance Units ................................................................................... 6-10
6.3.3 Spare parts for periodic maintenance ...................................................... 6-10
7. AFTER-SALES SERVICE ............................................................................. 7-1
Warranty .......................................................................................................... 7-1
Holding period of Spare parts ............................................................................ 7-1
Before returning to repair ................................................................................ 7-1
Periodical maintenance recommended ........................................................... 7-1
Содержание JHS-183
Страница 2: ......
Страница 7: ...v External Views NTE 183 AIS Transponder NCM 983 AIS Controller ...
Страница 8: ...vi Optional equipment NQE 5183 Connection Box NBD 577C Power Supply Unit ...
Страница 12: ...x ...
Страница 16: ...1 4 1 4 Outline Outline Drawing of NTE 183 AIS Transponder Unit mm Mass approx 2 6kg ...
Страница 17: ...1 5 Outline Drawing of NCM 983 AIS Controller Unit mm Mass approx 2 1 kg ...
Страница 18: ...1 6 Outline Drawing of NQE 5183 Connection Box Unit mm Mass approx 2 5 kg ...
Страница 19: ...1 7 Outline Drawing of NBD 577C Power Supply Unit Unit mm Mass approx 5 2 kg ...
Страница 22: ...2 2 ...
Страница 26: ...4 2 ...
Страница 92: ...5 66 ...
Страница 98: ......
Страница 110: ...7 2 ...
Страница 124: ......
Страница 126: ......
Страница 127: ......