a. Chilled or hot water inlet line
b. Cooling water inlet line
c. Residential hot water line
5. Air piping work is complete, leak tested, and flushed for the following lines:
a. Chilled or hot water
b. Cooling water
c. Fuel gas
d. Flue or Chimney
e. Residential hot water
6. Clean the mesh strainers on the line
7. Start the chilled or hot water, cooling water, and residential hot water pump.
8. The water box pressure does not exceed the maximum pressure for the:
a. Chilled or hot water
b. Cooling water
c. Residential hot water pump
9. The flow rate is adjusted within acceptable range for:
a. Chilled or hot water
b. Cooling water
c. Residential hot water
10. The flue damper has an open limit switch. Its signal is connected to the
control panel as an interlock signal.
C. Valve and sensor check
1. Adjusting valves are set correctly.
2. The diaphragm valves in the purge line are closed.
3. Spindle valve in the purge line is open.
4. Changeover valves are set in operation mode.
5. The detection component of the thermosensor is inserted into the thermowell
according to design requirements.
3
YHAU-CGN/H-CXR(M) Small Direct Fired Absorption Chiller-Heater Checklist
93
Model YHAU-CGN/H-CXR(M)Double Effect Direct Fired Small Absorption Chiller-Heater