Figure 51: Direct fire sequential operation flowchart
Note:
1. Implement sequential operation of the chilled/hot water pump and the cooling water
pump from the chiller-heater.
2. If there is one air conditioner only, secure interlock for the air conditioner operation
(indicated by broken lines in the previous diagram).
3. Implement sequential operation in such a way that when the chilled/hot water pump
stops, the cooling water stops too.
4. If the chilled/hot and cooling water system is on a common system, it is necessary
to install the isolation valve on the chilled/hot water and cooling water inlet pipe
entering the chiller, and interlock these isolation valves with the chiller control panel.
It is mandatory for safe and reliable operation of the chiller, and prevents potential
crystallization of lithium bromide solution and freezing of the evaporator tubes.
Figure 52: Stopping absorption chiller-heater direct fire flowchart
89
Model YHAU-CGN/H-CXR(M)Double Effect Direct Fired Small Absorption Chiller-Heater