![Johnson Controls FRICK QUANTUM HD Скачать руководство пользователя страница 98](http://html.mh-extra.com/html/johnson-controls/frick-quantum-hd/frick-quantum-hd_operation_2023218098.webp)
QUANTUM™ HD COMPRESSOR CONTROL PANEL
OPERATION
090.040-O (MAR 12)
Page 98
CONFIGURATION
Digital Auxiliaries - Timed - Scheduled Control
ACCESSING:
Timed
Scheduled Control
Digital Auxiliaries
DESCRIPTION:
This screen may be used to custom as-
sign up to two available digital outputs (A & B) to a timed
schedule:
SCHEDULED DIGITAL OUTPUT CONTROL
Timed Output A - (Off or On status shown)
NOTE:
This section is identical for Timed
Output B also.
Control
- Three choices are provided:
• Disabled
- Output will never
energize (under timed control).
• Running
- Output will only be
controlled while the Compressor is
Running.
• Always
- The Output will be
controlled all of the time.
Schedule
- Two selections are provided:
• Every
Day
- The Output will be
controlled seven days a week.
• Week
Days
- The Output will be
controlled Monday through Friday
only.
I/O Board
- Three selections are provided:
• None
- No board selected.
• Digital
Board
1
- The Output to
be controlled is located on Digital
Board 1.
• Digital Board 2
- The Output to
be controlled is located on Digital
Board 2.
The following setpoint boxes and drop down
menus are available for Outputs A and B:
On
- Enter into these setpoint boxes the
actual time of day that you want the Output
to energize.
Off
- Enter into these setpoint boxes the
actual time of day that you want the Output
to de-energize.
I/O Channel
- Enter the channel of the
selected Digital Board to control (1 - 24).
Содержание FRICK QUANTUM HD
Страница 14: ...QUANTUM HD COMPRESSOR CONTROL PANEL OPERATION 090 040 O MAR 12 Page 14 NOTES ...
Страница 138: ...QUANTUM HD COMPRESSOR CONTROL PANEL OPERATION 090 040 O MAR 12 Page 138 NOTES ...
Страница 157: ...QUANTUM HD COMPRESSOR CONTROL PANEL OPERATION 090 040 O MAR 12 Page 157 OIL PUMP STARTING LOGIC No Pump ...