19
Sales/Spares & Replacement Help Line 01604 762881
FIGURE 17.
GAS FLUE TEST POINT
FLUE
GAS
TEST
POINT
FIGURE 18. SERVICING SEQUENCE
FLUE GAS
TEST POINT
16.
SERVICING & MAINTENANCE
16.1 SERVICING SCHEDULE
To ensure that the appliance gives continued operation that is both safe and efficient, it is necessary to
carry out regular service checks and whilst the period between servicing will depend on the installation
condition and the demands placed upon the appliance. It is recommended that the appliance be
serviced annually.
IMPORTANT:
It is a statutory requirement that ALL work be carried out by a “competent person”, which in
normal circumstances would be a GAS SAFE registered engineer.
NOTE:
In order to carry out either servicing or replacement of components, the
heater front door must be removed.
16.2 SERVICING SEQUENCE
16.2.1 Light the heater and carry out a pre-service check, noting any
operational faults.
16.2.2 Check the gas consumption.
16.2.3 Put the appliance in test mode. Refer to paragraph 18.1. Connect a
suitable flue gas analyser to the sampling point on the top of the air
heater or into the flue terminal if access is possible (optional test).
See Figure 17.
16.2.4 For correct air heater operation, the CO to CO² ratio should be
checked at the maximum and minimum in test mode.
16.2.5 Check that the gas input is at least 90 % of the
nominal.
WARNING:
Always turn OFF the gas supply at the gas service cock
and switch OFF. Disconnect the electricity supply to the appliance before
servicing.
COMPONENT SERVICING CHECKLIST
16.2.6 Clean and check the main burner and electrodes.
See paragraph 16.4.
16.2.7 Visually check combustion chamber, removing
any debris. See section 16.8.
16.2.8 Remove the Combustion Air Fan (CAF) and
clean. See section 16.8.
16.2.9 Check the condensate pipes and tubes for
blockages.
16.2.10 Check that the flue terminal is unobstructed and
that the flue system is fully assembled correctly.
16.2.11 Remove the Air Circulation Fan (ACF) and filter,
inspect and clean. See paragraph 16.7.
16.2.12 After completing the servicing or exchange of
components, always test for gas tightness and
carry out functional checks as described above.
16.2.13 When work is complete, check the condition of
the sealing foam in the inside of the front door
panel. When the door is refitting you must make
ensure a good seal is made.
16.2.14 After servicing, complete the relevant Service
Interval Record section of the Benchmark
Checklist located on the inside back pages of this
document.
2
2
1
3
3
1
Содержание WARMCAIR C26D
Страница 29: ...29 Sales Spares Replacement Help Line 01604 762881 20 FAULT FINDING FLOW CHART...
Страница 42: ...NOTES...
Страница 43: ...NOTES...