background image

www.johnsonandstarley.co.uk

10

FIGURE 7
IGNITION CONTROLLERS

FEATURES

1  Inlet Pressure Test Point
2  Outlet Pressure Test Point
3  Burner Pressure Adjuster
4  Ignition Control
5  Manual Reset

C) FRONT VIEW

with ignition controller removed

1

3

2

A) SIDE VIEW

with ignition controller in place

1

2

4

3

B) FRONT VIEW

with ignition controller in place

5

11.3.4   Locate the status LED indicator which can be 

observed through the inspection hole in the bottom 
right hand corner of the control module.

11.3.5 

Turn on the mains power supply to the heater

11.3.6 

Set the “AIR HEATER”  switch on the time control to 
“CONT.” and observe the LED status indicator.

11.3.7 

Whilst the control module runs through its 
diagnostic cycle the decimal point (DP) in the 
bottom right hand corner of the LED display will 
flash continuously. 

11.3.8 

The ignitor will spark for a maximum period of 60 
seconds during which time the ignition and main 
burners SHOULD ignite and the igniter will stop. 

11.3.9 

When the control module reaches stage 5, 
(indicated by “5” on the LED) power is fed to the 
gas valve and the green LED “ON” light on the 
indicator panel will illuminate. After a period of 
approx. 5 seconds, the module will move on to 
stage 6 (indicated by “6” on the LED). 

NOTE: 

 

Regardless of when the burner ignites during 

the 60 second period, the LED will continue to 
display stage 6. 

11.3.10  If, after the 60 second period, the main burner has 

ignited the LED indicator will show “0” and the 
green LED “ON” light on the indicator panel will 
remain steady.

11.3.11  If the main burner fails to ignite, the red LED 

marked “LOCKOUT” will illuminate on the display 
panel and the LED status indicator will display 
an alphanumeric character relevant to the fault 
detected.

11.3.12  In the event of a lockout and the ignition and main 

burners failing to ignite, reference should be made 
to Table 6 in the fault finding section of these 
instructions in order to establish the fault condition.

11.3.13  Allow the air heater to operate for a minimum of 15 

minutes to ensure stability.

11.3.14  Reset the thermista-stat to the desired comfort level 

11.3.15  Set the time control to the desired “on and “off” 

periods.

11.3.16  Set the “AIR HEATER” switch on the time control to 

“TIMED”.

FIGURE 6
ELECTRICAL DOOR ASSEMBLY 

COVER 

PLATE 

SCREW

TERMINAL

BLOCK

TIME CONTROL

COVER 

PLATE 

SCREW

LED

STATUS

INDICATOR

INDICATOR PANEL

Содержание ECONOMAIRE 32

Страница 1: ...k Publication No ZZ 1088 12 April 2010 ECONOMAIRE 32 WARM AIR HEATER with Intejan Water Circulator INSTALLATION COMMISSIONING SERVICING INSTRUCTIONS G C NUMBERS Air Heater 42 416 14 Water Circulator 5...

Страница 2: ...nt for their needs that it is installed commissioned and serviced in accordance with the manufacturer s instructions by competent persons and that it meets the requirements of the appropriate Building...

Страница 3: ...for retro fit to the ECONOMAIRE 32 2 2 The air heater output can be adjusted between 7 3kW 26 4MJ h 25 000 Btu h and 9 4kW 33 8MJ h 32 000 Btu h summer air circulation of unheated air is available by...

Страница 4: ...n existing base duct warm air plenum always ensure that installation is carried out such that the rear left hand corner of the heater is aligned with the rear left hand corner of the base duct so that...

Страница 5: ...t size of return air grilles and ducting is used For heaters on maximum output the return air duct size should not be less than the equivalent of 250mm x 200mm 10 x 8 If flexible duct is used the duct...

Страница 6: ...larly under a balcony or immediately adjacent to a drain pipe 8 2 3 The terminal position must ensure that combustion products cannot enter the building in which the heater is installed or any adjacen...

Страница 7: ...From a vertical drain pipe or soil pipe 150mm H From an internal or external corner Greater than 450mm protrusion 300mm I Above ground roof or balcony level 300mm J From a surface facing the terminal...

Страница 8: ...al Terminal Support Bracket 1 1000 0014980 Terrcotta 7 Lead Pitched Roof Flashing Collar 1 1000 0014890 Anthracite 8 Lead Pitched Roof Flashing Collar 1 1000 0014990 Terracotta 9 Aluminium Flat Roof F...

Страница 9: ...chnical data paragraph 1 3 10 2 An independent gas supply pipe from the meter is to be preferred wherever possible Where this is not possible the pipe must be capable of taking the complete input of t...

Страница 10: ...green LED ON light on the indicator panel will illuminate After a period of approx 5 seconds the module will move on to stage 6 indicated by 6 on the LED NOTE Regardless of when the burner ignites dur...

Страница 11: ...chmark Checklist located on the inside back pages of this document prior to handing over the appliance to the occupier 11 6 SAFETY CHECK In order to check the correct operation of the control module r...

Страница 12: ...maintained you MUST ensure that flow and return pipes into the sealed compartment are sealed with the supplied grommets 12 2 WATER CONNECTIONS NOTE Both flow and return connections are Rp in BSP fema...

Страница 13: ...main burner SHOULD ignite and the igniter will stop 13 2 9 When the control module reaches stage 8 indicated by 8 on the LED power is fed to the gas valve and the green LED ON light on the indicator p...

Страница 14: ...ntrol thermista stat and the SUMMER AIRFLOW switch 14 2 4 That the time control must be reset following a power failure 14 2 5 How to use the circulator thermostat to set the water temperature 14 2 6...

Страница 15: ...nction control remove the relevant burner assembly fixing screws 15 2 7 Break the gas supply at the gas union and remove the gas feed pipe fixing screw 15 2 8 Whilst supporting the assembly carefully...

Страница 16: ...e cover plate screws 15 7 10 Re establish electrical supply 15 7 11 Commission air heater and water circulator as described in the relevant sections above 15 8 TIME CONTROL SWITCH AND LED INDICATOR DA...

Страница 17: ...embly as detailed at paragraph 15 2 15 11 5 Remove the multifunctional control for the water circulator IF FITTED 15 11 6 Release the 4 x screws securing the combustion chamber heat shield and withdra...

Страница 18: ...water circulator will override those for the air heater therefore LED displays 8 and 9 will override 5 and 6 For this reason it is strongly recommended that the air heater and water circulator be comm...

Страница 19: ...19 Telephone 01604 762881 FIGURE 12 CONTROL FLOWCHART 17 DIAGNOSIS FLOWCHARTS...

Страница 20: ...www johnsonandstarley co uk 20 FIGURE 13 AIR HEATER DIAGNOSIS FLOWCHART...

Страница 21: ...21 Telephone 01604 762881 FIGURE 14 CONTROL FLOWCHART...

Страница 22: ...www johnsonandstarley co uk 22 18 LOGIC DIAGRAM FIGURE 15 LOGIC DIAGRAM...

Страница 23: ...23 Telephone 01604 762881 3 19 SCHEMATIC DIAGRAM FIGURE 16 SCHEMATIC DIAGRAM...

Страница 24: ...www johnsonandstarley co uk 24 FIGURE 17 CIRCUIT DIAGRAM 20 CIRCUIT DIAGRAM Showing connections of an external controller...

Страница 25: ...25 Telephone 01604 762881 21 DIMENSIONS FIGURE 18 DIMENSIONS...

Страница 26: ...1 23 381 712 1000 0705140 Ignition Burner Injector No 36 1 392935 1000 0701260 Ignition Burner Injector No 27 from serial number 54000501 1 24 E69653 1000 1507310 Gasket 1 25 E95 494 S01159 Air Press...

Страница 27: ...27 Telephone 01604 762881 FIGURE 19 EXPLODED DIAGRAM 23 EXPLODED DIAGRAM...

Страница 28: ...from Johnson Starley Ltd Telephone the Sales Office for further information ECONOMAIRE 32 ANCILLARY S Description Product Code 1 Cleanflow Air Filter ECF32 2 Return Air Plenums RAP32 3 Side Return Ai...

Страница 29: ...29 Telephone 01604 762881 This Log Book should be filled out at each annual service ECONOMAIRE 32 LOG BOOK WARM AIR HEATER AND WATER CIRCULATOR COMMISSIONING CHECKLIST...

Страница 30: ...ty but does not affect statutory rights Customer Name Address Telephone Number Warm Air Unit Make and Model Warm Air Unit Serial Number Commissioned by print name Gas Safe Reg No Company Name Telephon...

Страница 31: ......

Страница 32: ...les Telephone 01604 707012 Fax 01604 764879 Service Telephone 01604 707011 Fax 01604 707017 Warm Air Upgrade Enquiry Service Telephone 01604 707026 Fax 01604 707017 COMMERCIAL INDUSTRIAL H V SOLUTIONS...