www.johnsonandstarley.co.uk
CONTENTS
The Benchmark Scheme
2
1
Features
3
2
Brief Description
3
3
Important Information
3
4
Technical Data
4
5
Heater Compartment & Clearances
4
6
Ventilation Air
5
7
Duct System
5
8
Flue Instructions
6
9
Electrical
9
10
Gas
9
11
Air Heater Commissioning
9
12
Intejan Circulator
12
13
Intejan Circulator Commissioning
13
14
Users Instructions
14
15
Maintenance
14
16
Defect Diagnosis
18
17
Diagnosis Flow Charts
19
18
Logic Diagram
22
19
Schematic Diagram
23
20
Circuit Diagram
24
21
Dimensions
25
22
List of Spares
26
23
Exploded Diagram
27
24
Economaire Ancillaries
28
25
Benchmark Checklist
29
THE BENCHMARK SCHEME
In order to comply with Building Regulations Part L (Part J in Scotland) the boiler MUST be fitted in accordance with the
manufacturer’s instructions.
Benchmark places responsibilities on both manufacturers and installers. The purpose is to ensure that customers are
provided with the correct equipment for their needs, that it is installed, commissioned and serviced in accordance with
the manufacturer’s instructions by competent persons and that it meets the requirements of the appropriate Building
Regulations. The Benchmark Checklist can be used to demonstrate compliance with Building Regulations and should be
provided to the customer for future reference.
Installers are required to carry out installation, commissioning and servicing work in accordance with the Benchmark Code
of Practice which is available from the Heating and Hotwater Industry Council who manage and promote the Scheme.
Visit www.centralheating.co.uk for more information.
PLEASE READ THESE INSTRUCTIONS CAREFULLY BEFORE STARTING
THE INSTALLATION. ON COMPLETION LEAVE THESE INSTRUCTION WITH
THE USER OR AT THE GAS METER.
In the interest of continuous development Johnson and Starley reserve the right to change specification without prior notice. Johnson and Starley
prides itself on it’s ability to supply spare parts quickly and efficiently.
If your service engineer indicates a problem in obtaining a spare part, advise him to contact Johnson and Starley Spares Department.
Содержание ECONOMAIRE 32
Страница 19: ...19 Telephone 01604 762881 FIGURE 12 CONTROL FLOWCHART 17 DIAGNOSIS FLOWCHARTS...
Страница 20: ...www johnsonandstarley co uk 20 FIGURE 13 AIR HEATER DIAGNOSIS FLOWCHART...
Страница 21: ...21 Telephone 01604 762881 FIGURE 14 CONTROL FLOWCHART...
Страница 22: ...www johnsonandstarley co uk 22 18 LOGIC DIAGRAM FIGURE 15 LOGIC DIAGRAM...
Страница 23: ...23 Telephone 01604 762881 3 19 SCHEMATIC DIAGRAM FIGURE 16 SCHEMATIC DIAGRAM...
Страница 25: ...25 Telephone 01604 762881 21 DIMENSIONS FIGURE 18 DIMENSIONS...
Страница 27: ...27 Telephone 01604 762881 FIGURE 19 EXPLODED DIAGRAM 23 EXPLODED DIAGRAM...
Страница 31: ......