CONTROLS
Tick the appropriate boxes if applicable
Time & Temperature
Room Thermostat &
Programmable
Load/Weather
Optimum Start
Control to Heating
Programmer/Timer
Roomstat
Compensation
Control
Time & Temperature
Cylinder Thermostat &
Warm Air
Control to Hot Water
Programmer/Timer
Unit
Heating Zone Valves
Fitted
Not Required
Hot Water Zone Valves
Fitted
Not Required
Thermostatic Radiator Valves
Fitted
Not Required
Automatic Bypass System
Fitted
Not Required
Warm Air Unit Interlock
Yes
No If YES, Volume Litres
* All installations in England and Wales must be notifi ed to Local Authority Building Control (LABC) either directly or through a Competent
Persons Scheme. A Building Regulations Compliance Certifi cate will then be issued to the customer.
© Heating and Hotwater Industry Council (HHIC)
www.centralheating.co.uk
WARM AIR HEATER AND CIRCULATOR COMMISSIONING CHECKLIST
This Commissioning Checklist is to be completed in full by the competent person who commissioned the warm air unit and associated equipment as a means of
demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
Failure to install and commission this equipment to the manufacturer’s instructions may invalidate the warranty but does not affect statutory rights.
Customer Name
Address
Telephone Number
Warm Air Unit Make and Model
Warm Air Unit Serial Number
Commissioned by (print name)
Gas Safe Reg. No.
Company Name
Telephone No.
Company Address
Commissioning Date
To be completed by the customer on receipt of a Building Regulations Compliance Certifi cate*:
Building Regulations Notifi cation Number
(if applicable)
Commissioning Engineer’s Signature
Customer’s Signature
(To confi rm demonstration of equipment and receipt of appliance instructions)
FOR WARM AIR HEATERS ONLY
Has the system been balanced in accordance with the heater manufacture’s instructions?
Yes
No
Was an anemometer used?
Yes
No
Have balancing dampers been fi tted?
Yes
No
FOR WARM AIR HEATING: MEASURE AND RECORD
Burner operating pressure
mbar
Heat input
kW
Temperature difference between return air inlet and nearest outlet
°C
FOR HOT WATER GENERATORS: MEASURE AND RECORD
Burner operating pressure
mbar
Heat input
kW
Water fl ow temperature
°C
ALL INSTALLATIONS
The heating and hot water system complies with the appropriate Building Regulations
Yes
The system and associated products have been installed and commissioned in accordance with the manufacturer’s instructions
Yes
The effi cient operation of system and its controls have been demonstrated to and understood by the customer
Yes
The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer
Yes
Содержание ECONOMAIRE 32
Страница 19: ...19 Telephone 01604 762881 FIGURE 12 CONTROL FLOWCHART 17 DIAGNOSIS FLOWCHARTS...
Страница 20: ...www johnsonandstarley co uk 20 FIGURE 13 AIR HEATER DIAGNOSIS FLOWCHART...
Страница 21: ...21 Telephone 01604 762881 FIGURE 14 CONTROL FLOWCHART...
Страница 22: ...www johnsonandstarley co uk 22 18 LOGIC DIAGRAM FIGURE 15 LOGIC DIAGRAM...
Страница 23: ...23 Telephone 01604 762881 3 19 SCHEMATIC DIAGRAM FIGURE 16 SCHEMATIC DIAGRAM...
Страница 25: ...25 Telephone 01604 762881 21 DIMENSIONS FIGURE 18 DIMENSIONS...
Страница 27: ...27 Telephone 01604 762881 FIGURE 19 EXPLODED DIAGRAM 23 EXPLODED DIAGRAM...
Страница 31: ......