5
Maintenance
Danger
!
●
Maintenance should be done by professional maintenance technical person.
●
Please ensure that AC side breakers should be turned off firstly, then DC side
breakers should be turned off before checking and maintaining, after waiting at least
5 minutes, should measure DC side and AC side voltage with a voltage meter, to
ensure that operation under the circumstance of no voltage between DC side and AC
side.
Содержание JNP1K1L-G
Страница 1: ...I Solar Pumping Inverter 用户手册 User Manual JNP1K1L G JNP1K5L G JNP2K2L G JNP2K2L G V3 EN V3 0 ...
Страница 55: ...47 Figure8 2 LCD diagram 1 ...
Страница 86: ...78 ...