89/132
SANITARY APPLIANCE OPERATION
USE OF THE MARINE HEADS
Before you use the heads, check that the water intake valve and draining valve are open.
To empty the bowl:
- Set the control lever of the pump slantwise (FLUSH).
- Operate the pump.
To dry the bowl:
- Set the lever back vertical (DRY).
- Operate the pump.
In order to avoid clogging the heads, use absorbent paper exclusively.
Schedule a regular rinsing through of the heads with fresh water.
Close the valves after each use (in particular when the boat is unattended).
USE OF THE WASHBASINS AND SHOWERS
- Close the valves and turn off the taps after use.
- Operate the pump switch to drive the water out of the shower.
RECOMMENDATION
When you are in a marina, use the club-house sanitary facilities (if there are).
Since it is prohibited to discharge the waste waters in some marinas or countries, you shall use a waste
holding tank (WHT).
7
PLUMBING
Содержание SUN ODYSSEY 42 DS
Страница 1: ...SUN ODYSSEY 42 DS OWNER S MANUAL C ROISIERE...
Страница 2: ......
Страница 4: ...5 1 3 5 2 ISO 10 240 HISTORY OF UPDATES Index 0 08 2005...
Страница 8: ......
Страница 9: ...5 132 5 1 3 5 2 ISO 10 240 SPECIFICATIONS AND WARRANTY YOUR BOAT TERMS AND CONDITIONS OF WARRANTY 1...
Страница 16: ......
Страница 24: ......
Страница 26: ......
Страница 28: ...24 132 5 3 3 h ISO 10 240 EMERGENCY TILLER NOTE See page 46 Steering Gear...
Страница 30: ......
Страница 32: ......
Страница 36: ......
Страница 38: ......
Страница 40: ......
Страница 41: ...37 132 5 3 5 4 5 5 ISO 10 240 DECK NAVIGATION MOORING TOWING ANCHORING MAINTENANCE OF THE DECK STEERING GEAR 4...
Страница 44: ......
Страница 46: ......
Страница 48: ......
Страница 52: ......
Страница 53: ...49 132 5 3 5 4 5 5 ISO 10 240 RIGGING AND SAILS STANDING RIGGING RUNNING RIGGING WINCHES SAIL SETTING SAILS 5...
Страница 72: ......
Страница 74: ......
Страница 75: ...71 132 5 3 5 4 5 5 ISO 10 240 ACCOMMODATIONS MAINTENANCE FABRICS 6...
Страница 76: ...72 132 5 3 1 ISO 10 240...
Страница 78: ......
Страница 80: ......
Страница 82: ......
Страница 84: ......
Страница 100: ......
Страница 102: ......
Страница 104: ...100 132 5 3 3 b 5 5 1 ISO 10 240 SHORE POWER...
Страница 106: ......
Страница 110: ...106 132 5 3 3 c 5 3 3 k 5 5 1 ISO 10 240 FUEL VALVE 1 Fuel oil valve for engine...
Страница 114: ......
Страница 116: ......
Страница 118: ...114 132 POSITION OF THE LEAD LINES hj Lead lines Log and speedometer...
Страница 122: ......
Страница 123: ...119 132 5 2 5 3 5 4 ISO 10 240 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 10...
Страница 124: ......
Страница 126: ......
Страница 128: ......
Страница 129: ...125 132 5 3 5 4 5 5 ISO 10 240 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11...
Страница 130: ......
Страница 132: ......
Страница 134: ......
Страница 136: ......