115/132
VISIBILITY FROM THE STEERING STATION
The international regulations to prevent collision at sea (COLREG) and the course regulations make
mandatory a permanent and proper surveillance and the respect of priority.
Make sure there is no other boat on your way.
The visibility from the steering station may be obstructed in the following conditions:
- Load and load distribution.
- Sea conditions, rain, spray, fog or darkness.
- Lights on inside the boat.
- Persons and removable equipments in the helmsman's field of visibility.
CONTROL PANEL/CONTROL LEVER
The instrument panel has all the testing functions of the engine and it does not require any special
precaution (refer to engine leaflet).
Check the clutch and accelerator cables (lubricate the end fittings and forks).
NAVIGATION
RECOMMENDATION
- When the engine is running, avoid making noise and chops near the other users.
- Respect speed limits.
- When sailing, set the lever on reverse gear to lock the propeller.
- To start the engine again, reduce the speed of the boat when sailing (in order to be able to
disengage the clutch before starting it again).
9
DIESEL ENGINE
Содержание SUN ODYSSEY 42 DS
Страница 1: ...SUN ODYSSEY 42 DS OWNER S MANUAL C ROISIERE...
Страница 2: ......
Страница 4: ...5 1 3 5 2 ISO 10 240 HISTORY OF UPDATES Index 0 08 2005...
Страница 8: ......
Страница 9: ...5 132 5 1 3 5 2 ISO 10 240 SPECIFICATIONS AND WARRANTY YOUR BOAT TERMS AND CONDITIONS OF WARRANTY 1...
Страница 16: ......
Страница 24: ......
Страница 26: ......
Страница 28: ...24 132 5 3 3 h ISO 10 240 EMERGENCY TILLER NOTE See page 46 Steering Gear...
Страница 30: ......
Страница 32: ......
Страница 36: ......
Страница 38: ......
Страница 40: ......
Страница 41: ...37 132 5 3 5 4 5 5 ISO 10 240 DECK NAVIGATION MOORING TOWING ANCHORING MAINTENANCE OF THE DECK STEERING GEAR 4...
Страница 44: ......
Страница 46: ......
Страница 48: ......
Страница 52: ......
Страница 53: ...49 132 5 3 5 4 5 5 ISO 10 240 RIGGING AND SAILS STANDING RIGGING RUNNING RIGGING WINCHES SAIL SETTING SAILS 5...
Страница 72: ......
Страница 74: ......
Страница 75: ...71 132 5 3 5 4 5 5 ISO 10 240 ACCOMMODATIONS MAINTENANCE FABRICS 6...
Страница 76: ...72 132 5 3 1 ISO 10 240...
Страница 78: ......
Страница 80: ......
Страница 82: ......
Страница 84: ......
Страница 100: ......
Страница 102: ......
Страница 104: ...100 132 5 3 3 b 5 5 1 ISO 10 240 SHORE POWER...
Страница 106: ......
Страница 110: ...106 132 5 3 3 c 5 3 3 k 5 5 1 ISO 10 240 FUEL VALVE 1 Fuel oil valve for engine...
Страница 114: ......
Страница 116: ......
Страница 118: ...114 132 POSITION OF THE LEAD LINES hj Lead lines Log and speedometer...
Страница 122: ......
Страница 123: ...119 132 5 2 5 3 5 4 ISO 10 240 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 10...
Страница 124: ......
Страница 126: ......
Страница 128: ......
Страница 129: ...125 132 5 3 5 4 5 5 ISO 10 240 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11...
Страница 130: ......
Страница 132: ......
Страница 134: ......
Страница 136: ......