57/132
MAINTENANCE
Before each trip, carefully inspect the mast from top to bottom.
Periodically check the rigging tightening and the lock nut or pin locking (you should check it for the
first time after a few days sailing in all types of weather).
Secure and lubricate the bottle screws with tallow, graphite grease or other.
Never lubricate the bottle screws with silicone.
Check the bottle screw tightening.
Inspect the bottle screws for possible wear (due to the chainplate friction if the rigging is slack).
Change any shroud or stay with severed wires or kinks.
Regularly check the chainplates and inside tie rods for condition.
ADVICE: Your JEANNEAU dealer can carry out all the maintenance operations.
DANGER
To hoist a crew member up to the top of the mast, make a bowline with the halyard directly on the
bosun's chair ring
(never use the halyard snap shackle or shackle).
Do not hoist a crew member when sailing in heavy weather.
5
RIGGING AND SAILS
Содержание SUN ODYSSEY 42 DS
Страница 1: ...SUN ODYSSEY 42 DS OWNER S MANUAL C ROISIERE...
Страница 2: ......
Страница 4: ...5 1 3 5 2 ISO 10 240 HISTORY OF UPDATES Index 0 08 2005...
Страница 8: ......
Страница 9: ...5 132 5 1 3 5 2 ISO 10 240 SPECIFICATIONS AND WARRANTY YOUR BOAT TERMS AND CONDITIONS OF WARRANTY 1...
Страница 16: ......
Страница 24: ......
Страница 26: ......
Страница 28: ...24 132 5 3 3 h ISO 10 240 EMERGENCY TILLER NOTE See page 46 Steering Gear...
Страница 30: ......
Страница 32: ......
Страница 36: ......
Страница 38: ......
Страница 40: ......
Страница 41: ...37 132 5 3 5 4 5 5 ISO 10 240 DECK NAVIGATION MOORING TOWING ANCHORING MAINTENANCE OF THE DECK STEERING GEAR 4...
Страница 44: ......
Страница 46: ......
Страница 48: ......
Страница 52: ......
Страница 53: ...49 132 5 3 5 4 5 5 ISO 10 240 RIGGING AND SAILS STANDING RIGGING RUNNING RIGGING WINCHES SAIL SETTING SAILS 5...
Страница 72: ......
Страница 74: ......
Страница 75: ...71 132 5 3 5 4 5 5 ISO 10 240 ACCOMMODATIONS MAINTENANCE FABRICS 6...
Страница 76: ...72 132 5 3 1 ISO 10 240...
Страница 78: ......
Страница 80: ......
Страница 82: ......
Страница 84: ......
Страница 100: ......
Страница 102: ......
Страница 104: ...100 132 5 3 3 b 5 5 1 ISO 10 240 SHORE POWER...
Страница 106: ......
Страница 110: ...106 132 5 3 3 c 5 3 3 k 5 5 1 ISO 10 240 FUEL VALVE 1 Fuel oil valve for engine...
Страница 114: ......
Страница 116: ......
Страница 118: ...114 132 POSITION OF THE LEAD LINES hj Lead lines Log and speedometer...
Страница 122: ......
Страница 123: ...119 132 5 2 5 3 5 4 ISO 10 240 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 10...
Страница 124: ......
Страница 126: ......
Страница 128: ......
Страница 129: ...125 132 5 3 5 4 5 5 ISO 10 240 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11...
Страница 130: ......
Страница 132: ......
Страница 134: ......
Страница 136: ......