52/132
5.3.2 ISO 10 240
CLASSICAL MAST
1. Masthead light
2. Backstay attachment
3. Wiring passage - Optional extra
4. Forestay attachment
5. Shroud attachment
6. Genoa halyard sheave
7. Sheave - Spinnaker boom topping lift
8. Spreader attachment
9. Mouse line for radar
10. Engine navigation light / Deck searchlight
11. Spi pole traveller sheave
12. Genoa halyard exit
13. Spi halyard exit
14. Spi pole topping lift exit
15. Boom topping lift exit
16. Main halyard exit
17. Spi pole rail
18. Jammer
19. Gooseneck
20. Main topping lift cleat
21. Cleat - Genoa halyard
22. Access hatch
23. Spi pole eye
24. Mast foot
25. Vang fittings
26. Main sheet eye
27. Boom end fitting
Содержание SUN ODYSSEY 42 DS
Страница 1: ...SUN ODYSSEY 42 DS OWNER S MANUAL C ROISIERE...
Страница 2: ......
Страница 4: ...5 1 3 5 2 ISO 10 240 HISTORY OF UPDATES Index 0 08 2005...
Страница 8: ......
Страница 9: ...5 132 5 1 3 5 2 ISO 10 240 SPECIFICATIONS AND WARRANTY YOUR BOAT TERMS AND CONDITIONS OF WARRANTY 1...
Страница 16: ......
Страница 24: ......
Страница 26: ......
Страница 28: ...24 132 5 3 3 h ISO 10 240 EMERGENCY TILLER NOTE See page 46 Steering Gear...
Страница 30: ......
Страница 32: ......
Страница 36: ......
Страница 38: ......
Страница 40: ......
Страница 41: ...37 132 5 3 5 4 5 5 ISO 10 240 DECK NAVIGATION MOORING TOWING ANCHORING MAINTENANCE OF THE DECK STEERING GEAR 4...
Страница 44: ......
Страница 46: ......
Страница 48: ......
Страница 52: ......
Страница 53: ...49 132 5 3 5 4 5 5 ISO 10 240 RIGGING AND SAILS STANDING RIGGING RUNNING RIGGING WINCHES SAIL SETTING SAILS 5...
Страница 72: ......
Страница 74: ......
Страница 75: ...71 132 5 3 5 4 5 5 ISO 10 240 ACCOMMODATIONS MAINTENANCE FABRICS 6...
Страница 76: ...72 132 5 3 1 ISO 10 240...
Страница 78: ......
Страница 80: ......
Страница 82: ......
Страница 84: ......
Страница 100: ......
Страница 102: ......
Страница 104: ...100 132 5 3 3 b 5 5 1 ISO 10 240 SHORE POWER...
Страница 106: ......
Страница 110: ...106 132 5 3 3 c 5 3 3 k 5 5 1 ISO 10 240 FUEL VALVE 1 Fuel oil valve for engine...
Страница 114: ......
Страница 116: ......
Страница 118: ...114 132 POSITION OF THE LEAD LINES hj Lead lines Log and speedometer...
Страница 122: ......
Страница 123: ...119 132 5 2 5 3 5 4 ISO 10 240 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 10...
Страница 124: ......
Страница 126: ......
Страница 128: ......
Страница 129: ...125 132 5 3 5 4 5 5 ISO 10 240 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11...
Страница 130: ......
Страница 132: ......
Страница 134: ......
Страница 136: ......