43/132
HEAVING UP THE ANCHOR
- Lock the cable lifter snubber.
- Ensure the chain is properly set on the cable lifter.
- Slowly go near the anchor, using your engine (Don't use your windlass to winch the boat).
- Heave the anchor completely.
- Visually check the last meters till the anchor gets into contact with the davit.
- If you just change berth, check the position of the anchor on the stem fitting.
- When sailing, store the anchor in the chain locker.
- With an electric windlass, switch the power off as soon as the chain is fast.
STERN ANCHORING
Stern anchoring shall be performed with the engine declutched.
- Secure the required length of cablet on the mooring cleat.
- Pay out the anchor line slowly.
- Take care you don't damage the propeller or rudder.
MAINTENANCE
WARNING
Windlass operations are dangerous:
- Always keep the anchor line unfouled and free.
- Always proceed with care, using gloves and always wearing shoes.
- If your boat is equipped with the twin control optional extra, make sure you use only onecontrol
at the same time..
RECOMMENDATION
After each trip rinse the windlass and mooring line with fresh water.
Refer to the manufacturer's instructions for windlass maintenance at the beginning or end of the
season.
4
DECK
Содержание SUN ODYSSEY 42 DS
Страница 1: ...SUN ODYSSEY 42 DS OWNER S MANUAL C ROISIERE...
Страница 2: ......
Страница 4: ...5 1 3 5 2 ISO 10 240 HISTORY OF UPDATES Index 0 08 2005...
Страница 8: ......
Страница 9: ...5 132 5 1 3 5 2 ISO 10 240 SPECIFICATIONS AND WARRANTY YOUR BOAT TERMS AND CONDITIONS OF WARRANTY 1...
Страница 16: ......
Страница 24: ......
Страница 26: ......
Страница 28: ...24 132 5 3 3 h ISO 10 240 EMERGENCY TILLER NOTE See page 46 Steering Gear...
Страница 30: ......
Страница 32: ......
Страница 36: ......
Страница 38: ......
Страница 40: ......
Страница 41: ...37 132 5 3 5 4 5 5 ISO 10 240 DECK NAVIGATION MOORING TOWING ANCHORING MAINTENANCE OF THE DECK STEERING GEAR 4...
Страница 44: ......
Страница 46: ......
Страница 48: ......
Страница 52: ......
Страница 53: ...49 132 5 3 5 4 5 5 ISO 10 240 RIGGING AND SAILS STANDING RIGGING RUNNING RIGGING WINCHES SAIL SETTING SAILS 5...
Страница 72: ......
Страница 74: ......
Страница 75: ...71 132 5 3 5 4 5 5 ISO 10 240 ACCOMMODATIONS MAINTENANCE FABRICS 6...
Страница 76: ...72 132 5 3 1 ISO 10 240...
Страница 78: ......
Страница 80: ......
Страница 82: ......
Страница 84: ......
Страница 100: ......
Страница 102: ......
Страница 104: ...100 132 5 3 3 b 5 5 1 ISO 10 240 SHORE POWER...
Страница 106: ......
Страница 110: ...106 132 5 3 3 c 5 3 3 k 5 5 1 ISO 10 240 FUEL VALVE 1 Fuel oil valve for engine...
Страница 114: ......
Страница 116: ......
Страница 118: ...114 132 POSITION OF THE LEAD LINES hj Lead lines Log and speedometer...
Страница 122: ......
Страница 123: ...119 132 5 2 5 3 5 4 ISO 10 240 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 10...
Страница 124: ......
Страница 126: ......
Страница 128: ......
Страница 129: ...125 132 5 3 5 4 5 5 ISO 10 240 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11...
Страница 130: ......
Страница 132: ......
Страница 134: ......
Страница 136: ......