![JDS Uniphase T-BERD 6000A Скачать руководство пользователя страница 19](http://html2.mh-extra.com/html/jds-uniphase/t-berd-6000a/t-berd-6000a_testing-manual_3587519019.webp)
Page 19 of 28
Technical Support
1 866 228-3762
Systems Engineer
321-243-0600
7.
Configure Test
Press the
Configure
Navigation key to configure test setting. Using the
Right Arrow
key or
Settings
soft key, scroll through Settings menus
and configure your test as follows. Leave all other values at default,
unless specified in the Work Order.
For Layer 2 Testing:
For Layer 3 IP Testing:
8.
View Results
Press the
Home
key to display Summary Results.
9.
Turn Laser On
For optical testing, press the
Action
soft key and select
Laser On
.
10.
Restart
Press the
Restart
soft key to reset test results.
11.
Check LED Results Press the
Right Arrow
key until
LED Results
are displayed. A
Green
Signal Present LED indicates that the HST-3000 is receiving an optical
signal from the near end Ethernet Switch.
Green
Sync Acquired
and
Link Active
LEDs indicate that the HST-3000 has successfully
connected to the near end Ethernet switch and the Ethernet link is active.
Menu
Option
Value
Comment
Test Mode
Test
Layer 2 Traffic
.
RFC 2544 Mode
Disable
Link Init
Auto Negotiation
See Work Order
Set to same values as
Ethernet switch port.
Speed
See Work Order
Duplex
Full
Menu
Option
Value
Comment
Test Mode
Test
Layer 3 IP Traffic
.
RFC 2544 Mode
Disable
Link Init
Auto Negotiation
See Work Order
Set to same values as
Ethernet switch port.
Speed
See Work Order
Duplex
Full
IP Init
ARP Mode
Disable
Source Type
Static IP
Source IP
See Work Order
Subnet Mask
See Work Order
Default Gateway
See Work Order