JDS Uniphase T-BERD 6000A Скачать руководство пользователя страница 1

Page 1 of 28 

 
 
Technical Support 

[email protected]

 

1 866 228-3762 

Systems Engineer 

[email protected]

 

321-243-0600

 

 

 
 

 

 
 

JDSU T-BERD 6000A  

RFC-2544 Ethernet  

Testing Guide 

 

 

Version 1.0 

December 19, 2011 

 

 

 

Содержание T-BERD 6000A

Страница 1: ...Page 1 of 28 Technical Support tac jdsu com 1 866 228 3762 Systems Engineer Dave Baker jdsu com 321 243 0600 JDSU T BERD 6000A RFC 2544 Ethernet Testing Guide Version 1 0 December 19 2011...

Страница 2: ...for Metro Ethernet service up to 1 Gbps including Layer 2 and Layer 3 IPv4 RFC 2544 tests between two T BERD 6000A s Layer 2 and Layer 3 IPv4 RFC 2544 tests between the T BERD 6000A and T BERD 5800 L...

Страница 3: ...ed to validate the performance of an Ethernet circuit and to verify conformance to the agreed upon Service Level Agreement SLA 1 1 Hardware Description The T BERD 6000A is a portable test tools for Et...

Страница 4: ...Gbps links Layer 2 and Layer 3 IPv4 testing JDSU T BERD 6000A T BERD 5800 and HST 3000 loopback devices Procedures are described for RFC 2544 Tests to verify throughput round trip delay jitter and fra...

Страница 5: ...roximately 1 minute for the Base Unit software to load 4 Launch MSAM Press the SYSTEM button The MSAM is represented by a BERT icon on the upper image of the test set If the BERT icon is not already h...

Страница 6: ...Reset to Defaults In the Tools menu select Reset Test to Defaults Press OK to continue 10 Setup Press the SETUP soft key on the top right side of screen Select the indicated folders and configure you...

Страница 7: ...sults A Green Signal Present LED indicates that the T BERD is receiving an optical signal from the near end Ethernet Switch Green Sync Acquired and Link Active LEDs indicate that the T BERD has succes...

Страница 8: ...s Zero in Process JDSU Enhanced Trial Duration seconds 60 Frame Loss Tolerance 0 Show Pass Fail Status Selected Throughput Threshold Mbps See Work Order for CIR Setup Latency RTD Number of Trials 1 Tr...

Страница 9: ...BERD will loop up the far end unit and test Throughput Delay Jitter and Frame Loss The test will take 6 to 9 minutes to complete At the conclusion of the test the T BERD 6000A will automatically loop...

Страница 10: ...mary tab to view status of all tests Verify that all tests PASS and the displayed values meet the performance objectives of the line under test 22 Exit Tap Exit to return to the main Results view 23 R...

Страница 11: ...mately 1 minute for the Base Unit software to load 4 Launch MSAM Press the SYSTEM button The MSAM is represented by a BERT icon on the upper image of the test set If the BERT icon is not already highl...

Страница 12: ...ptical Testing Ethernet 1GigE Optical Layer 3 Traffic IPv4 Terminate 9 Reset to Defaults In the Tools menu select Reset Test to Defaults Press OK to continue 10 Setup Press the SETUP soft key on the t...

Страница 13: ...e Right side of the display to reset test results A Green Signal Present LED indicates that the T BERD is receiving an optical signal from the near end Ethernet Switch Green Sync Acquired and Link Act...

Страница 14: ...sting insert desired SFP 1000BASE SX 1000BASE LX or 1000BASE ZX in the desired T BERD 5800 s SFP port 3 Clean Inspect While the BERT module is starting up and before connecting to an optical link make...

Страница 15: ...he SETUP soft key on the top right side of screen Select the indicated folders and configure your test as follows Leave all other values at default unless specified in the Work Order Folder Option Val...

Страница 16: ...end Ethernet Switch Green Sync Acquired and Link Active LEDs indicate that the T BERD has successfully connected to the near end Ethernet switch and the Ethernet link is active 11 Check ARP Status If...

Страница 17: ...o load 3 Insert SFP For optical testing insert desired SFP 1000BASE SX 1000BASE LX or 1000BASE ZX into the optical SFP connector labeled R T 1 4 Clean Inspect While the BERT module is starting up and...

Страница 18: ...ayer 2 Traffic at the Test prompt For Layer 2 Optical Testing press the ETH OPTIC Soft key select 1G Terminate and press the OK key Select Layer 2 Traffic at the Test prompt For Layer 3 IPv4 Electrica...

Страница 19: ...t Arrow key until LED Results are displayed A Green Signal Present LED indicates that the HST 3000 is receiving an optical signal from the near end Ethernet Switch Green Sync Acquired and Link Active...

Страница 20: ...600 12 Check ARP Status If you are running a Layer 3 IPv4 Test verify that the final message in the Message bar is ARP Successful If ARP Successful is not displayed verify that the HST 3000 s IP menu...

Страница 21: ...benchmarking methodology The RFC 2544 procedure outlined in Section 2 should be completed prior to RFC 6349 testing Test procedures are described for Electrical and Optical handoffs 10Mbps 100Mbps and...

Страница 22: ...cedure to set up a T BERD 6000A to test TCP Throughput Step Action Details 1 Select Test For electrical handoffs In the Test menu at the top of the Results screen and select Ethernet 10 100 1000 Layer...

Страница 23: ...x See Work Order Options only displayed if Auto Negotiate Off Speed For Optical handoffs Select the indicated folders and configure your test as follows Folder Option Value s Comment Interface Connect...

Страница 24: ...Order For Layer 2 handoffs set to None Connect to Port 5001 Source IP Type Static Source IP See Work Order For Layer 2 handoffs set to 192 168 1 2 Default Gateway See Work Order For Layer 2 handoffs...

Страница 25: ...Duration 30 Setup Traffic Shaping Duration seconds 30 Other Traffic Shaping fields will be autopopulated by the TrueSpeed application Setup TCP Throughput Window Size Set as close as possible to the I...

Страница 26: ...e prompt Select the Append option and tap Yes to save the test report to the T BERD 6000A hard drive in PDF format The filename including a time and date stamp will be displayed in the Progress log 13...

Страница 27: ...ure to set up a T BERD 6000A as a TCP Server Step Action Details 1 Select Test For Electrical handoffs In the Test menu at the top of the Results screen and select Ethernet 10 100 1000 Layer 4 TCP Wir...

Страница 28: ...value as Ethernet switch port For all handoffs Select the indicated folders and configure your test as follows Leave all other values at default unless specified in the Work Order Folder Option Value...

Отзывы: