42
FNS-0014-060-EN June 2019 Rev A
Rebuilding (Continued)
Figure 26. Thrust Washer on Both Sides
13. Before installing chain, align timing marks as shown.
Refer to Figure 27.
This is critical to operation of the machine. Adjust chain as shown in Maintenance section.
Figure 27. Alignment of Timing Marks
ROTATION
Align Marks
Содержание Fresh'n Squeeze Series
Страница 1: ...June 2019 2nd Generation Multi Fruit Juicer Service Manual...
Страница 8: ...8 FNS 0014 060 EN June 2019 Rev A Figure 2 Juicing Components Assembly...
Страница 23: ...23 FNS 0014 060 EN June 2019 Rev A Figure 6 Sharpening Cutter...
Страница 25: ...25 FNS 0014 060 EN June 2019 Rev A Figure 8 Proper Orifice Tube Installation...
Страница 39: ...39 FNS 0014 060 EN June 2019 Rev A Figure 22 Completed Assembly of Lower Drive Arm...
Страница 44: ...44 FNS 0014 060 EN June 2019 Rev A Figure 28 Rebuild Tool Kit...
Страница 64: ...64 FNS 0014 060 EN June 2019 Rev A 19 Electrical Connections Figure 47 Electrical Connections...
Страница 79: ...79 FNS 0014 060 EN June 2019 Rev A Figure 60 Electrical Panel Assembly Sheet 1 of 2...
Страница 80: ...80 FNS 0014 060 EN June 2019 Rev A Figure 61 Electrical Panel Assembly Sheet 2 of 2...
Страница 81: ...81 FNS 0014 060 EN June 2019 Rev A Figure 62 Wiring Schematic Electrical Panel Sheet 1 of 2...
Страница 82: ...82 FNS 0014 060 EN June 2019 Rev A Figure 63 Wiring Schematic Electrical Panel Sheet 2 of 2...
Страница 83: ...83 FNS 0014 060 EN June 2019 Rev A Figure 64 Wire Table Electrical Panel...