instALLAtiOn instRuctiOns (cont.)
ELEctRicAL
electrical power Supply:
These instructions are written
assuming 60Hz, 120v power supply. Special notations are
also included for 50Hz 240v pump, control equipment, and
power supply.
WA R N I N G
:
v e R I F I CAT I O N O F e l e C T R I CA l
R e q U I R e M e N T S M U S T b e M A D e b e F O R e
INSTAllATION. ReFeR TO The eqUIpMeNT lAbelS
FOR vOlTAGe AND FReqUeNCy ReqUIReMeNTS.
NOTe: verify that the electrical service matches either the
120v (or 240v for Signature edition) system requirements
for this bath.
NOTe: The bath is designed for indoor use only. The
electrical equipment must not be exposed to direct
or indirect water or moisture contact. The electrical
equipment must also be protected from dust and other
airborne debris before, during, and after installation.
electrical Service:
1.
A licensed electrician must provide
the “dedicated” electrical service protected by a GFCI.
The location of the GFCI must be at least five (5) feet
(152 cm) away from the inside surface of the bath,
accessible for regular testing. Use copper conductors only.
DANGeR — RISK OF eleCTRIC ShOCK: Connect
only to a circuit protected by a Ground Fault Circuit
Interrupter (GFCI). In the unlikely occurrence of
a current imbalance in the power conductors,
the GFCI will interrupt the power to the bath.
WARNING: The eleCTRICAl SeRvICe TO The
GFCI MUST NOT be INTeRRUpTeD by ANy
CONTROl DevICe. lIKeWISe, The eleCTRICAl
SeRvICe FROM The GFCI TO The bATh CONTROl
ShOUlD be DIReCT AND NOT INTeRRUpTeD
by A SWITCh. NeveR USe A SWITCh IN
CONJUNCTION WITh A CONTROl DevICe. ThIS
WIll vOID The MANUFACTUReR’S WARRANTy.
G R O U N D I N G
I S
R e q U I R e D
2.
The unit should be installed by a qualified
service representative and properly grounded.
I N S T A L L S E R V I C E C O N N E C T I O N A T
3.
L E A S T 6 ” (15 c m) A B O V E S U B F L O O R .
All lOCAl AND STATe eleCTRICAl AND plUMbING
CODeS MUST be ObSeRveD.
Where there are no local
codes the
National electric Code (NeC)
and
Uniform
plumbing Code (UpC)
shall be observed. It is the
responsibility of the installer/owner to determine specific
code compliance prior to installation of the product.
NOTe:
In the Commonwealth of Massachusetts, installation
is to be done by a Massachusetts licensed plumber.
Standard/premier edition Control box (120v).
4.
The
pump is prewired to a control box. The control box has a
36” (91cm) cord with plug end. If a Jetted Neck Pillow is
installed an additional control box will be included. The
control box(es) are mounted on a stand that is temporarily
secured to the packing board for shipping. These boxes
must remain on the control box bracket so that the two
boxes can communicate properly through their infrared
communication feature. During installation, the control
box bracket and controls must be positioned horizontally
and located to permit access for inspection and servicing.
The pump control box must be plugged into a dedicated
120v (volt), 20A (amp), 60Hz (hertz), Ground Fault Circuit
Interrupter (GFCI) protected circuit.
(See Figure 4)
Standard/premier edition Control box (240v).
5.
The
pump is prewired to the control box. The control box has
a 36 inch [91 cm] cord with a junction box connection. If
a Jetted Neck Pillow is installed an additional control box
will be included. The control box(es) are mounted on a
stand that is temporarily secured to the packing board for
shipping. These boxes must remain on the control box
bracket so that the two boxes can communicate properly
through their infrared communication feature. During
installation, the control box stand and controls must be
positioned horizontally and located to permit access for
inspection and servicing. The pump control box must be
connected into a dedicated 240v 20A, 50 or 60 Hz, GFCI
protected circuit.
(See Figure 4)
Signature edition Control box.
6.
The pump is prewired to
the control box. The control box has a 36 inch [91 cm] cord
with a junction box connection. The control box is mounted
on a stand that is temporarily secured to the packing board
for shipping. During installation, the control box stand
and controls must be positioned horizontally and located
to permit access for inspection and servicing. The pump
junction box must be connected into a dedicated 240v
20A, 50 or 60 Hz, GFCI protected circuit.
(See Figure 4A)
For the LS640, the junction box for the pumps
must be connected into a dedicated 240v, 20A,
60Hz, GFCI protected circuit.
(See Figure 4b)
DANGeR: Do not alter the factory installed wiring. All
building materials and wiring should be routed away from
the equipment or other heat-producing components of
the unit.