SJ 24
Regarding lubricating points and change and control of oil
level see page 14
ELECTRICAL
CONNECTIONS
Before connecting the machine to the power supply, make sure
that the supply corresponds with the setting of the motors
stated in the control cabinet.
The power supply is connected in the control cabinet at the
left side of the column.
Control the direction of rotation by means of the wheel
up- and down switch pos. (C) .
If the symbols do not correspond with the movements, two of
the main-phases must be interchanged and all motors will then
automatically have the correct direction of rotation.
DO NOT USE THE GRINDING WHEEL MOTOR FOR CONTROLLING THE
DIRECTION OF ROTATION.
STARTING-UP AND RUNNING IN
1) Start the hydraulic pump by operating push button
(A).
2} Remove the front cover from base of the machine and turn
Table Speed Control Lever
(24}
to blue mark position.
Check oi2 pressure. Pressure on the gauge must only be
32 kg/cm (460 lbs/sq.in. }
The pressure is adjusted by means of the regulating screw
No. 21. Do not forget to shut off the pressure gauge valve
(20} after checking the pressure.
PRESSURE GAUGE
•�M
32Kg/cm. a (460 lbs/sq ·1nch.)
21
I
)
'
I
�
I
:
------
J�
-- / 0 ----------------
i
Q_
B �
HB
Содержание SJ24
Страница 3: ...SJ 24 LEVELlt JG SCREW L 5 400 I I I 1065 41 930 r I I I I I i r i J 3360 132 285 2A 7 I I I I I...
Страница 6: ...SJ 24 4A e ot Q STOP 0...
Страница 12: ...SJ 24 7A...
Страница 14: ...SJ 24 42 43 SA I 45 i6...