SJ
24
CLEANING
Before shi
pm
ent all unpainted surfaces were coated with a rust
preventive compound. This may be removed by wiping with rags
saturated with paraffin oil (
pe
troleum). It is especially im
portant to cle.an the free ends of the longitudinal guide ways.
3
After the cleaning compound has be.en removed, wipe all finished
surfaces with a cloth moistened with lubricating oil.
DO NOT MOVE ANY OF THE CONTROLS OR MOVING PARTS UNTIL THE
MACHINE HAS BEEN THOROUGHLY CLEANED AND LUBRICATED.
INSTALLATION ON FLOOR
For maximum stability and consistent accuracy of work to be
produced on this machine the foundation should be as solid
as possible. A special foundation is not necessary. Any floor
is suitable provided it is strong enough to support the weight
of the machine without vibration.
The Grinder should be as free as possible from vibrations
set up by other equipment. These outside vibrations have
a definite effect on the finish produced by the Grinder.
The machine must be leveled by
means of the three leveling screws
(L) and the two stay-bolts (S).
It is recommended to place five
steel plates 100 x 100 x 12 mm
( 4" x 4-" x ½" ) as base plates
under the leveling screws and stay
bolts.
With a machine spirit level placed on the ground top surface
of the table, level first the machine in the longitudinal
direction and thereafter crosswise whereupon the longitu
dinal direction is controlled again.
NOTE: It is a condition for the accuracy of the machine
that it is leveled by means of the three leveling screws,
pos. L, whereas the stay bolts S afterwards are thread
down until they support.
Содержание SJ24
Страница 3: ...SJ 24 LEVELlt JG SCREW L 5 400 I I I 1065 41 930 r I I I I I i r i J 3360 132 285 2A 7 I I I I I...
Страница 6: ...SJ 24 4A e ot Q STOP 0...
Страница 12: ...SJ 24 7A...
Страница 14: ...SJ 24 42 43 SA I 45 i6...