File Version: 3.4
39
/
73
JAKA Zu Series Hardware User Manual
8.5.3
End-Effector Mounting
The JAKA Zu series robots tool flange have four M6 screw holes, which can be used to connect the end-effector
to the robot. When you mount screws into these screw holes, the screws need to be fastened with a torque of
13Nm (115.05lbf·in). If you need to adjust the position of the tool very accurately, refer to the side nail hole on
the tool flange to drill a
∅
6mm (0.236in) nail hole on the tool flange, and locate it with a nail. According to
ISO9409-1: 2004, the location pin hole center shall be aligned with the mechanical interface coordinate system
(ISO 9787:2013)+Xm, and our product is offset 45° clockwise on this basis.
1.
Zu 3 flange drawing
2.
Zu 5 Zu 7 flange drawing
3.
Zu 12 Zu 18 flange drawing
Содержание Zu Series
Страница 32: ...File Version 3 4 32 73 JAKA Zu Series Hardware User Manual 1 Zu 3 workspace 2 Zu 5 workspace...
Страница 33: ...File Version 3 4 33 73 JAKA Zu Series Hardware User Manual 3 Zu 7 workspace 4 Zu 12 workspace...
Страница 37: ...File Version 3 4 37 73 JAKA Zu Series Hardware User Manual 2 Zu 5 Zu 7 base drawing...
Страница 38: ...File Version 3 4 38 73 JAKA Zu Series Hardware User Manual 3 Zu 12 Zu 18 base drawing...