GO-5000M-PGE-UV User Manual (Ver. 1.2)
Preparation
- 20 -
Step 3: Verify Camera Operation
When power is supplied to the camera while the necessary equipment is connected, the
POWER/TRIG LED at the rear of the camera lights amber, and initialization of the camera starts.
When initialization is complete, the POWER/TRIG LED lights green.
Verify whether power is being supplied to the camera by checking the rear LED. When properly turned
on, the power LED is lit green.
For details on how to read the LEDs, see the
section.
Step 4: Verify the Connection between the Camera and PC
Verify whether the camera is properly recognized via Control Tool.
1. Launch eBUS Player for JAI
eBUS Player for JAI startup screen appears.
Содержание GO-5000M-PGE-UV
Страница 46: ...GO 5000M PGE UV User Manual Ver 1 2 Main Functions 46 Output Timing Vertical Vertical Timing ...
Страница 55: ...GO 5000M PGE UV User Manual Ver 1 2 Main Functions 55 How to Determine the Maximum Frame Rate ...
Страница 60: ...GO 5000M PGE UV User Manual Ver 1 2 Main Functions 60 ALC Channel Area ...
Страница 74: ...GO 5000M PGE UV User Manual Ver 1 2 Main Functions 74 Multi ROI Setting Example ...
Страница 86: ...GO 5000M PGE UV User Manual Ver 1 2 Miscellaneous 86 Spectral Response ...