AD-131GE
35
Calculation example
8.4.4 V Binning scan Vertical timing
The vertical transfer and horizontal transfer of CCD are arranged to add two adjacent pixels
located vertically. As the result, the vertical lines is reduced to 483 lines and the transfer rate
is increased instead. The horizontal timing is the same as the Full Frame scan.
If Binning vertical is set to 2 (V-Binning ON)
Fig.30 Vertical timing for V-Binning
1L: 1 LVAL Period ( 38.189us), OB: Optical Black
S G
S UB
L VAL
F VAL
1 F VAL Per i o d
DVAL
DATA OUT
1 2 3 4 5
OB
4 L
L V A L
F V A L
4 9 4 L
4 8 9 L
5 L
0 . 5 L
1 1 L
6 L
4
8
3
4
8
2
4
8
1
4
8
0
4
7
9
B l a n k
E f f ec t i v e L i nes
OB 1 L
Exposure
Period
Exposure Active
483L
Reference
JAI Partial Scan
Height Offset Y
Total
Line
FPS
Full Line
False
966
0
982
31.484
Full Line
True
966
0
978
31.613
Center 2/3 Partial
True
644
160
720
42.941
Center 1/2 Partial
True
482
242
590
52.403
Center 1/4 Partial
True
242
362
398
77.682
Center 1/8Partial
True
120
422
302
102.380
Center 8 Line
True
8
478
212
145.84
Содержание AD-131GE
Страница 80: ...AD 131GE 79 ...
Страница 81: ...AD 131GE 80 ...
Страница 82: ...AD 131GE 81 ...
Страница 84: ...AD 131GE 83 ...
Страница 91: ...AD 131GE 90 Change History Month Year Revision Changes July 2012 1 0 New issue ...