Core Unit Disassembly
TOOLS REQUIRED:
13mm Wrench
13mm Socket Wrench
19mm Wrench
19mm Socket Wrench
Impeller Removal
During most potable reservoir installations, it
is recommended that the impeller be removed
if the equipment is passing through a small
hatch and will be orientated sideways or
disassembled.
STEP 1:
First identify the impeller assembly
components shown to the right.
STEP 2:
With the machine off, locate the
clevis pin going through the upper shaft
coupling. Remove the hair pin and pull clevis
pin out.
STEP 3:
Grab the impeller shaft below the
flag indicator, lift up and then outward until
lower coupling and shaft are disconnected
from upper coupling and brushless motor.
STEP 4:
Place the Impeller Assembly off to
the side and re-insert the Clevis Pin and Hair
Pin into the Upper Coupling for safe keeping.
• • • IMPORTANT • • •
The following pages give detailed instructions on how to assemble different portions of the machine,
however, the order in which the components are assembled may need to be altered based on
the hatch size and whether the reservoir will be dry or empty. For instance, the hose and intake
assembly can be performed on the tank exterior prior to lowering the equipment inside if the hatch
size is at least 6 feet X 6 feet (1.83 m X 1.83 m) which will allow the core unit assembly to be installed
without major disassembly required. For smaller hatches, the core unit will need to be broken down
into 3 primary components and the hose and intake assembly will need to be performed inside
the reservoir. The following order listed is based on a dry installation and small hatch opening.
Coupling Sleeve
Lower Coupling
Upper Coupling
Hair Pin
Clevis Pin
Impeller Assembly Removal Motion
Shaft Coupling
©2022 IXOM Watercare Inc. | www.ixomwatercare.com | 866 - 437 - 8076 | [email protected]
Equipment Assembly
458_10264_20220110
O&M_SB5000PW_10272_20220119 - 15