BreakingPoint 20 Installation Guide
32
BreakingPoint Systems Inc. © 2005-2015
6. Push the ejectors so that they lock the blade into place.
7. Tighten the thumb fasteners by turning them in a clockwise direction.
8. Insert an SFP+ optical transceiver into each data port.
9. Insert a copper SFP Ethernet transceiver into the management port of the blade in the
bottommost slot.
Note:
Any unused optical transceiver must be covered with the rubber dust cover. This will
prevent the optical data port from damage and protect your eyes from the Class 1 lasers.
Powering the System
Before connecting any power cables to the chassis, verify that:
• The chassis has been securely fastened into an equipment rack.
• There is an AC power disconnect installed for the equipment rack, and it is easily accessible.
• The main AC power disconnect for the rack is properly labeled.
• All of the installation steps have been followed and all site and safety requirements have been
met.
• All the power switches are in the off position.
• The chassis is being powered by a BreakingPoint V2 Power Supply Tray if there are multiple
BreakingPoint 20 blades in the chassis.
After you have verified all of this information, you may proceed to the instructions for powering
the chassis.
To connect the power cables to the chassis:
1. Insert the female end of the supplied power cable into the power inlet, which is located on the
back of the chassis.
2. Insert the male end of the cable into an AC outlet.
3. Turn the power switch to Reset.
Once you have turned on the power for the chassis, you can proceed to the initial configuration for
the system. For more information, see section
Initial Configuration on page 35
.
Note:
Do not remove the fan tray while the BreakingPoint 20 is powered on. Power the system off
and wait until the fans have stopped running before removing the fan tray from the system.
Note:
A flashing Power Supply LED indicates that you do not have the proper power
configuration to power the blades in slot 1 or slot 2. Multiple BreakingPoint 20 blades in a
single chassis require a BreakingPoint V2 Power Supply Tray. If you are installing multiple
BreakingPoint 20 blades into a single chassis, make sure that your chassis is being powered
by a BreakingPoint V2 Power Supply Tray.
Connecting a Device Under Test to the BreakingPoint 20
After mounting and configuring the BreakingPoint 20, you can connect your device(s) under test to
the system.
Содержание BreakingPoint 20
Страница 1: ...BreakingPoint 20 Installation Guide Release 3 4 Jan 2015...
Страница 4: ...4 BreakingPoint 20 Installation Guide Release 3 4...
Страница 11: ...Documentation Feedback BreakingPoint BreakingPoint 20 Installation Guide iv BreakingPoint Systems Inc 2005 2015...
Страница 45: ...BreakingPoint 20 Installation Guide 34 BreakingPoint Systems Inc 2005 2015...
Страница 55: ...Update Questions BreakingPoint 20 Installation Guide 44 BreakingPoint Systems Inc 2005 2015...
Страница 61: ...CLI Commands BreakingPoint 20 Installation Guide VI BreakingPoint Systems Inc 2005 2015...