-
that there are no water leaks from the connecting
sleeves of engine cooling circuit pipes and cab internal
heating pipes, tighten the clamping collars if required;
-
the connection between the low pressure fuel pipes and
the relevant connectors;
-
that there are no oil leaks between the cover and the
cylinder head, between oil sump and engine block,
between heat exchanger oil filter and the relevant
housings and between the different pipes in the
lubricating circuit;
-
that there are no fuel leaks from the fuel pipes;
-
that there are no air leaks from pneumatic pipes (if
fitted);
Carefully check and bleed the engine cooling equipment by
repeated draining operations.
Checks and inspections
Start the engine and leave it running just above the
idling speed, wait until the coolant reaches the
temperature necessary to open the thermostat and
then check:
The following checking inspections must be carried
out after the engine assembly on the vehicle .
NOTE
SECTION 3 - INDUSTRIAL APPLICATION
41
VECTOR 8 ENGINES
Print P2D32V001E
Base - April 2006
Содержание VECTOR 8
Страница 1: ...VECTOR SERIES Industrial application VECTOR 8 Technical and Repair manual ...
Страница 10: ...2 VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 13: ...5 VECTOR 8 ENGINES Print P2D32V001E Base April 2006 UPDATING Section Description Page Date of revision ...
Страница 14: ...6 VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 16: ...2 SECTION 1 GENERAL SPECIFICATIONS VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 18: ...4 SECTION 1 GENERAL SPECIFICATIONS VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 28: ...14 SECTION 1 GENERAL SPECIFICATIONS VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 30: ...2 SECTION 2 FUEL VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 60: ...8 SECTION 3 INDUSTRIAL APPLICATION VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 62: ...10 SECTION 3 INDUSTRIAL APPLICATION VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 94: ...42 SECTION 3 INDUSTRIAL APPLICATION VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 96: ...44 SECTION 3 INDUSTRIAL APPLICATION VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 106: ...54 SECTION 3 INDUSTRIAL APPLICATION VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 107: ...THIRD PART DIAGNOSTICS SECTION 3 INDUSTRIAL APPLICATION 55 VECTOR 8 ENGINES Print P2D32V001E Base April 2006 ...
Страница 108: ...56 SECTION 3 INDUSTRIAL APPLICATION VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 129: ...FOURTH PART PLANNED MAINTENANCE SECTION 3 INDUSTRIAL APPLICATION 77 VECTOR 8 ENGINES Print P2D32V001E Base April 2006 ...
Страница 130: ...78 SECTION 3 INDUSTRIAL APPLICATION VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 191: ...SECTION 5 TOOLS 1 VECTOR 8 ENGINES Print P2D32V001E Base April 2006 SECTION 5 Tools Page TOOLS 3 ...
Страница 192: ...2 SECTION 5 TOOLS F4AE NEF ENGINES Base April 2006 Print P2D32V001E ...
Страница 204: ...2 APPENDIX F4AE NEF ENGINES Base April 2006 Print P2D32V001E ...