Figure 24
Figure 25
-
Tight with a pre-torque of 20 Nm the fitting on both side,
flow-limiter and injector side. During the tightening
procedure the injector and the flow-limiter have to be
hold against the tighten direction.
-
Tight with a final torque of 80±5 Nm the fitting on both
side, flow-limiter and injector side. During the tightening
procedure the injector and the flow-limiter have to be
hold against the tighten direction.
-
Test engine for leak detection.
-
Using the specific wrench, screw the cheese—headed
screw M10x70 back on to a tightening torque of 32
÷
36
Nm.
!
Always change the O—ring in the assembly phase.
Lubricate the O—ring before installation (use
vaseline).
-
Check the sealing surface of the leaking pipe and the
surface on the injector and flow limiter. Cleaning the
surfaces and remove dirt if necessary. In case the sealing
surface are damaged , replace the part.
-
Lubricate with clean engine oil the fitting and the sealing
surface.
-
Tight by hand the fitting on both side , flow-limiter and
injector side.
!
During positioning please clean well the spherical
surfaces and the Threaded part of pipe by dipping it
in a clean container filled with clean motor oil.
94
SECTION 3 - INDUSTRIAL APPLICATION
VECTOR 8 ENGINES
Base - April 2006
Print P2D32V001E
Содержание VECTOR 8
Страница 1: ...VECTOR SERIES Industrial application VECTOR 8 Technical and Repair manual ...
Страница 10: ...2 VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 13: ...5 VECTOR 8 ENGINES Print P2D32V001E Base April 2006 UPDATING Section Description Page Date of revision ...
Страница 14: ...6 VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 16: ...2 SECTION 1 GENERAL SPECIFICATIONS VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 18: ...4 SECTION 1 GENERAL SPECIFICATIONS VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 28: ...14 SECTION 1 GENERAL SPECIFICATIONS VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 30: ...2 SECTION 2 FUEL VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 60: ...8 SECTION 3 INDUSTRIAL APPLICATION VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 62: ...10 SECTION 3 INDUSTRIAL APPLICATION VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 94: ...42 SECTION 3 INDUSTRIAL APPLICATION VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 96: ...44 SECTION 3 INDUSTRIAL APPLICATION VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 106: ...54 SECTION 3 INDUSTRIAL APPLICATION VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 107: ...THIRD PART DIAGNOSTICS SECTION 3 INDUSTRIAL APPLICATION 55 VECTOR 8 ENGINES Print P2D32V001E Base April 2006 ...
Страница 108: ...56 SECTION 3 INDUSTRIAL APPLICATION VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 129: ...FOURTH PART PLANNED MAINTENANCE SECTION 3 INDUSTRIAL APPLICATION 77 VECTOR 8 ENGINES Print P2D32V001E Base April 2006 ...
Страница 130: ...78 SECTION 3 INDUSTRIAL APPLICATION VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 191: ...SECTION 5 TOOLS 1 VECTOR 8 ENGINES Print P2D32V001E Base April 2006 SECTION 5 Tools Page TOOLS 3 ...
Страница 192: ...2 SECTION 5 TOOLS F4AE NEF ENGINES Base April 2006 Print P2D32V001E ...
Страница 204: ...2 APPENDIX F4AE NEF ENGINES Base April 2006 Print P2D32V001E ...