
The connecting rod — piston assemblies (1) are fitted in the
cylinder liners with the aid of the flexible band 99360603 (2)
observing the following requirements:
-
lubricate the pistons, piston rings and cylinder liners with
engine oil;
-
take the crankpin of the piston involved in assembly to
T.D.C.;
-
the number of the connecting rod must correspond to
the number of the cylinder liner in which it is inserted and
must face the same side as that stamped on the cylinder
block; in addition, the wording ”TAPPET SIDE” on the
crown of the piston must face the camshaft;
-
the gaps in the piston rings must be staggered 120
°
apart.
Refit the main bearings that have not been replaced,
in the same position found at removal.
Do not try to adapt the half bearings.
Figure 68
After assembling the rod—piston group (1) check the squaring
using apparatus 99395363 (3) and feeler gauge (2). Squaring
must be exact otherwise the cause should be found and faulty
part replaced.
DIAGRAM FOR INSERTING THE CONNECTING
ROD-PISTON ASSEMBLY IN CYLINDER
1. Tappet side — 2. Camshaft
Fitting the rod—piston assemblies into the
cylinder liners
1
2
3
If it is not necessary to replace the big end bearings,
they must be reassembled according to the same
order and position found upon disassembly.
-
Fit half bearings (1) on connecting rod and cap.
Figure 69
Figure 70
Figure 71
37716
Check of rod/piston alignment
81350
16793
37717
NOTE
NOTE
32
SECTION 4 - OVERHAUL AND TECHNICAL SPECIFICATIONS
VECTOR 8 ENGINES
Base - April 2006
Print P2D32V001E
Содержание VECTOR 8
Страница 1: ...VECTOR SERIES Industrial application VECTOR 8 Technical and Repair manual ...
Страница 10: ...2 VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 13: ...5 VECTOR 8 ENGINES Print P2D32V001E Base April 2006 UPDATING Section Description Page Date of revision ...
Страница 14: ...6 VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 16: ...2 SECTION 1 GENERAL SPECIFICATIONS VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 18: ...4 SECTION 1 GENERAL SPECIFICATIONS VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 28: ...14 SECTION 1 GENERAL SPECIFICATIONS VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 30: ...2 SECTION 2 FUEL VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 60: ...8 SECTION 3 INDUSTRIAL APPLICATION VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 62: ...10 SECTION 3 INDUSTRIAL APPLICATION VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 94: ...42 SECTION 3 INDUSTRIAL APPLICATION VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 96: ...44 SECTION 3 INDUSTRIAL APPLICATION VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 106: ...54 SECTION 3 INDUSTRIAL APPLICATION VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 107: ...THIRD PART DIAGNOSTICS SECTION 3 INDUSTRIAL APPLICATION 55 VECTOR 8 ENGINES Print P2D32V001E Base April 2006 ...
Страница 108: ...56 SECTION 3 INDUSTRIAL APPLICATION VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 129: ...FOURTH PART PLANNED MAINTENANCE SECTION 3 INDUSTRIAL APPLICATION 77 VECTOR 8 ENGINES Print P2D32V001E Base April 2006 ...
Страница 130: ...78 SECTION 3 INDUSTRIAL APPLICATION VECTOR 8 ENGINES Base April 2006 Print P2D32V001E ...
Страница 191: ...SECTION 5 TOOLS 1 VECTOR 8 ENGINES Print P2D32V001E Base April 2006 SECTION 5 Tools Page TOOLS 3 ...
Страница 192: ...2 SECTION 5 TOOLS F4AE NEF ENGINES Base April 2006 Print P2D32V001E ...
Страница 204: ...2 APPENDIX F4AE NEF ENGINES Base April 2006 Print P2D32V001E ...