12
IQ Power™ BPS
5201197 Rev. D
Remote On/Off
Disabled
Normally Off
Opto High = Unit ON
Opto Low = Unit OFF
Normally On
Opto High = Unit OFF
Opto Low = Unit ON
Figure 11. Jumper Position at J3 for Remote Control Operation
Initial Considerations
Installation starts with mounting of the static neutralizing bar. Static bars are typically
installed just ahead of where problems due to static are occurring. The power supply is
installed in a convenient location within reach of the static bar high voltage cable and
visible to the machine operator. Communication modules (where used) may be installed at
any convenient location and connected to the system using the modular low voltage cable.