– 6 –
CERAMIC RADIANT BRICK INSTALLATION
VBB and VST models are shipped with radiant ceramic bricks in a separate box packed inside
the broiler or oven sections. Remove this box and unpack bricks. Handle bricks carefully as
the ceramic is fragile and easily cracked.
There are 18 total bricks and should be placed on the rails alongside the burners as shown.
When properly installed, there should be three bricks on each rail, and they should be placed
so as to be centered on the rail.
Содержание VULCAN V Series
Страница 16: ...NOTES 16 ...
Страница 17: ...NOTES 16 ...