Figure 16:
4.
Priming by Automatic Primer Pump, See
Figure 17:
Where there is a fluctuating suction lift that occasionally might drop below the normal limits of the
pump or for installations where there is any quantity of air entrained with the liquid being pumped,
the system shown in
is very well adapted.
A vacuum tank and a vacuum gauge can be installed near the primer pump and the vacuum switch
set to automatically start or stop the primer pump according to the vacuum required to keep the sys-
tem primed.
4.2 Regulation of cooling water flow
The supply of liquid to the water-cooled bearings and quenching glands should be regulated by valves in
the supply line. Approximately ½ G.P.M. to each gland and 1 G.P.M. to each bearing cooling coil is suffi-
cient. The cooling lines should be checked periodically to see that they have not become clogged.
4.2 Regulation of cooling water flow
3316 Installation, Operation and Maintenance Instructions
25
Содержание GOULDS PUMPS 3316
Страница 1: ...Installation Operation and Maintenance Instructions 3316 ...
Страница 2: ......
Страница 18: ...Figure 6 2 5 Install suction piping 16 3316 Installation Operation and Maintenance Instructions ...
Страница 41: ...Figure 20 7 10 Overhaul of pump 3316 Installation Operation and Maintenance Instructions 39 ...
Страница 44: ...Figure 22 Left hand pump 7 11 Reassembly of pump 42 3316 Installation Operation and Maintenance Instructions ...