3.6 Installation and connection of bearing cooling water piping
Bearing cooling coils are supplied when ordered. Bearings should be cooled when the liquid pumped is:
Between 250° and 350°F, in addition to gland quenching.
The cooling coils are installed as follows:
1.
Refer to
which shows the installed cooling coil.
2.
Special fittings and tubing are in the box of fittings sent with the pump.
3.
Remove four - ¼" plugs from bearing end covers (109 and 119) - one plug from each side of each
cover. The plugged openings are those below the openings for the constant level oilers.
4.
Screw ¼" pipe x ¼" OD tube compression fittings into each of the four openings.
5.
Push each ¼" OD x 9" long copper tube through one fitting until it comes out the fitting on the other
side. Center tubing so that equal lengths project from each side. Tighten nuts on compression fit-
tings.
6.
Connect the ¼" pipe x ¼" OD tubing elbow to each end of the copper tube. This provides a ¼" pipe
connection for cooling water piping.
7.
Connect cooling water. The inlet line should have a shutoff valve to regulate flow.
3.7 Connection of drain piping
Connect overflow outlets from stuffing boxes (located in casing near pump feet) to drain, and connect
overflow from bedplate (located at pump end of bedplate) to drain. All of the above overflow openings
are tapped for ¾" pipe.
3.6 Installation and connection of bearing cooling water piping
3316 Installation, Operation and Maintenance Instructions
21
Содержание GOULDS PUMPS 3316
Страница 1: ...Installation Operation and Maintenance Instructions 3316 ...
Страница 2: ......
Страница 18: ...Figure 6 2 5 Install suction piping 16 3316 Installation Operation and Maintenance Instructions ...
Страница 41: ...Figure 20 7 10 Overhaul of pump 3316 Installation Operation and Maintenance Instructions 39 ...
Страница 44: ...Figure 22 Left hand pump 7 11 Reassembly of pump 42 3316 Installation Operation and Maintenance Instructions ...