![Isokern IBV-36 Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/isokern/ibv-36/ibv-36_installation-operation-and-maintenance_2093406008.webp)
8
Required Component List
In addition to the standard IBV modular masonry firebox and smoke dome assembly components the IBV requires particular
components necessary to complete the installation and meet the ANSI Z-21.50 listing. The two boxes of special IBV components
include the following:
IBV Box 1 of 2:
1. One (1) B-Vent Installation, Operation, Maintenance and Owner’s Manual
2. One (1) metal canopy/wiring raceway with 4 mounting screws with high temperature limit switch and damper macro switch/
lever assembly pre-mounted. Warning stickers attached.
3. Two (2) high temperature wires, twelve feet long (12’)
IBV Box 2 of 2:
1. One (1) 10” anchor plate / down draft diverter / B-Vent starter collar/in-line damper combination unit with 4 mounting
screws
3. One (1) C-Clamp warning label
2. One (1) ceramic fiber blanket - 24” x 24” x 1/2 inch thick
Содержание IBV-36
Страница 43: ...43 Notes...