6
Commissioning
6.3
Settings in the web
visualisation
90
INTILION GmbH
Additional application-
specific settings should be made in the “Application settings” table.
With the “Setpoint specification” application, no individual settings need to be entered as
the battery storage system is controlled externally via the Modbus interface.
“Optimisation of energy consumption” application
With this application, you will need to enter the threshold maintained by the battery storage
system. In order to ensure maximum self-sufficiency, the entire amount of energy supplied
within the customer network is covered by private consumption. The threshold is therefore
usually set to 0 kW.
Illustration 55: INTILION
– interface for optimisation of energy consumption
“Peak shaving” application
With this application, you will need to enter the threshold maintained by the battery storage
system. The 15-
minute average power values are compensated above the set value. If “1” is
entered in the column for “Pulse per kWh of S0”, the S0 signal is transmitted from the central
connection meter to DI1 (-
XD14.5) in order to synchronise the timings of the “15-minute
average power values”.
Содержание scalebloc 0.5C
Страница 33: ...2 Safety 2 10 Obligations of the system manager INTILION scalebloc 0 5C 31 ...
Страница 34: ......
Страница 46: ...4 Transport and storage 3 3 Technical specifications 44 INTILION GmbH ...
Страница 77: ...5 Installation 5 12 Establishing the mains connection INTILION scalebloc 0 5C 75 ...
Страница 78: ......
Страница 98: ...6 Commissioning 6 8 Contacting the Hoppecke Service team 96 INTILION GmbH ...
Страница 100: ......
Страница 102: ...8 Fault 100 INTILION GmbH ...