6
Commissioning
6.3
Settings
in the web visualisation
INTILION scalebloc 0.5C
89
Illustration 54: INTILION configuration interface - enlarged
The following values should be entered in the “Setpoint” column of this table:
1. “Amount of scaleblocs”:
The total number of installed battery storage systems
connected to one another by a network cable is entered here.
You can choose a number between 1 (Single-Master system)
and 16 (complete assembly).
2. “Energymeter”:
A number between 0 and 6 should be entered here,
depending on the associated/installed energy meter. The
value “0” refers to the “Carlo Gavazzi EM24“ energy meter.
The value “6” is entered if there is no installed energy meter
and the battery storage system is being operated with the
“Setpoint specification” application. The value “5” is entered if
two “Carlo Gavazzi EM24” energy meters can be
incorporated. The second energy meter can be used to
receive additional energy flows such as the energy generated
by a PV system.
The system is currently compatible with
the “Carlo Gavazzi EM24” energy meter.
3. “Number of active applications”:
The number of applications to be adjusted should be
entered here. Information on the applications can be found in
Section 6.3.
The settings are adopted and imported into the “Actual” column by pressing the play icon
(at the bottom left of the screen).
Additional individual application settings
Содержание scalebloc 0.5C
Страница 33: ...2 Safety 2 10 Obligations of the system manager INTILION scalebloc 0 5C 31 ...
Страница 34: ......
Страница 46: ...4 Transport and storage 3 3 Technical specifications 44 INTILION GmbH ...
Страница 77: ...5 Installation 5 12 Establishing the mains connection INTILION scalebloc 0 5C 75 ...
Страница 78: ......
Страница 98: ...6 Commissioning 6 8 Contacting the Hoppecke Service team 96 INTILION GmbH ...
Страница 100: ......
Страница 102: ...8 Fault 100 INTILION GmbH ...