Installation
5.5
Positioning the
battery storage system onto the foundation and securing in place
50
INTILION GmbH
5.5
Positioning the battery storage system onto the
foundation and securing in place
The following illustration shows the technical drawing of the base. This drawing can be
used to ascertain the drill measurements for the attachment of the anchors (slots). A base
template can be requested from INTILION GmbH to help with assembly.
Illustration 13: Technical drawing of the base
Содержание scalebloc 0.5C
Страница 33: ...2 Safety 2 10 Obligations of the system manager INTILION scalebloc 0 5C 31 ...
Страница 34: ......
Страница 46: ...4 Transport and storage 3 3 Technical specifications 44 INTILION GmbH ...
Страница 77: ...5 Installation 5 12 Establishing the mains connection INTILION scalebloc 0 5C 75 ...
Страница 78: ......
Страница 98: ...6 Commissioning 6 8 Contacting the Hoppecke Service team 96 INTILION GmbH ...
Страница 100: ......
Страница 102: ...8 Fault 100 INTILION GmbH ...