5.10
Connecting
the communication, control and power cables
INTILION scalebloc 0.5C
67
5.10
Connecting the communication, control and power
cables
•
Connect the cables in accordance with the wiring diagram.
We recommend initially guiding the cables to the contacts and then screwing
them into the Icotek frame in their almost-final position (not yet connected) (see
following illustration).
Illustration 29: Icotek frame
1 Icotek frame
2 Grommets
In order to guarantee that the battery storage system has IP 55 protection, the cables
need to have the Icotek frame and the correct Icotek grommet.
•
Disassemble the Icotek frame from the floor plate.
•
Place the suitable Icotek grommets around the corresponding cables.
An Icotek grommet is suitable if it closes with a little pressure (see following illustration).
Содержание scalebloc 0.5C
Страница 33: ...2 Safety 2 10 Obligations of the system manager INTILION scalebloc 0 5C 31 ...
Страница 34: ......
Страница 46: ...4 Transport and storage 3 3 Technical specifications 44 INTILION GmbH ...
Страница 77: ...5 Installation 5 12 Establishing the mains connection INTILION scalebloc 0 5C 75 ...
Страница 78: ......
Страница 98: ...6 Commissioning 6 8 Contacting the Hoppecke Service team 96 INTILION GmbH ...
Страница 100: ......
Страница 102: ...8 Fault 100 INTILION GmbH ...