9
Maintenance
9.2
Inspection
and maintenance work
102
INTILION GmbH
Carry out the following activities prior to the re-commissioning of the battery storage
system:
–
Carry out another check of the screw connections that were previously loosened to
make sure that they are all now securely tightened.
–
Check whether all previously removed protective devices such as covers have been
properly re-fitted and attached.
–
Make sure that all of the tools, materials and other equipment used have been
removed from the working area.
–
Clean the working area.
–
Make sure that all of the safety devices in the battery storage system are working
perfectly again.
Once all maintenance work is complete, close all doors on the battery storage system.
9.2
Inspection and maintenance work
9.2.1
Maintenance intervals
Maintenance point
Annually
Entire battery storage system
Carry out a visual inspection,
check screw connections
Lithium-ion batteries
Visual inspection
Update the
displayed State
of Health
As per description
9.2.3.
3
AC unit
As per specifications
from INTILION GmbH
9.2.3.
4
Smoke detector
As per supplier
specifications
Doors
As per description
9.2.3.
6
Special maintenance intervals
Electrical
equipment
Safety inspection
Tab. 4: Maintenance intervals
Содержание scalebloc 0.5C
Страница 33: ...2 Safety 2 10 Obligations of the system manager INTILION scalebloc 0 5C 31 ...
Страница 34: ......
Страница 46: ...4 Transport and storage 3 3 Technical specifications 44 INTILION GmbH ...
Страница 77: ...5 Installation 5 12 Establishing the mains connection INTILION scalebloc 0 5C 75 ...
Страница 78: ......
Страница 98: ...6 Commissioning 6 8 Contacting the Hoppecke Service team 96 INTILION GmbH ...
Страница 100: ......
Страница 102: ...8 Fault 100 INTILION GmbH ...