
82
International
®
VT 275 V6 Engine
UNIQUE REPAIR PROCEDURES
Vibration Damper
• If the vibration damper bolts are removed,
they are not reusable and must be
discarded. Torque the new bolts to
specifications in the proper sequence.
Cylinder Head Torque Sequence
• Install new 14mm head bolts (lightly
lubricated). Torque bolts 1 through 8 in
sequence to 65 lb-ft (88 Nm).
• Torque bolts 1, 3, 5, and 7 to 85 lb-ft
(116 Nm).
• Torque bolts 2, 4, 6, and 8 to 85 lb-ft
(116 Nm).
• Tighten all bolts 1 through 8 in sequence
90 degrees.
• Tighten all bolts 1 through 8 a second time
90 degrees.
• Tighten all bolts numbered 1 through 8 a
third time 90 degrees.
• Tighten all bolts 9 through 12 in sequence
to 18 lb-ft.
• Tighten all bolts 9 through 12 in sequence
to 23 lb-ft.
44
22
11
33
Содержание VT 275 V6
Страница 1: ...VT 275 V6 ENGINE model year 2005...
Страница 4: ...4...
Страница 110: ...110 International VT 275 V6 Engine NOTES...
Страница 111: ...111 International VT 275 V6 Engine NOTES...
Страница 112: ...2005 INTERNATIONAL TRUCK AND ENGINE CORPORATION TMT 120502 PRINTED IN THE U S A...