
81
International
®
VT 275 V6 Engine
Installing Head and Carrier
• Verify that the cylinder head dowel sleeves
are installed in the crankcase. Install the
new head gasket and two guide pins
(locally made). Install the head and the four
8mm bolts across the top of the head.
Install the push rods with copper ends to
the rocker and the valve bridges in their
proper location.
• Rotate the crankshaft until the damper
dowel-pin hole is at six o'clock. Make sure
the rocker arm carrier dowels are in the
head and install the carrier. Verify dowel
engagement into the carrier as the head
bolts are tightened to specifications.
Intake Manifold Gaskets
• The intake manifold gaskets must be
oriented correctly upon reassembly. After
the intake manifold is assembled to the
engine, the gasket would be in the position
as shown with the tabs facing up. To aid in
reassembly, the gaskets can be held to the
intake manifold by pushing the manifold
bolts through the captured rubber washers
on the gasket.
UNIQUE REPAIR PROCEDURES
IIN
NTTAAK
KEE
IIN
NTTAAK
KEE
R
RO
OC
CK
KEER
R
R
RO
OC
CK
KEER
R
R
RO
OC
CK
KEER
R LLEEVVEER
R C
CAAR
RR
RIIEER
R
R
RO
OC
CK
KEER
R LLEEVVEER
R C
CAAR
RR
RIIEER
R
EEX
XH
HAAU
US
STT R
RO
OC
CK
KEER
R
EEX
XH
HAAU
US
STT R
RO
OC
CK
KEER
R
TTAAB
B
IIN
NTTAAK
KEE
M
MAAN
NIIFFO
OLLD
D
G
GAAS
SK
KEETT
Содержание VT 275 V6
Страница 1: ...VT 275 V6 ENGINE model year 2005...
Страница 4: ...4...
Страница 110: ...110 International VT 275 V6 Engine NOTES...
Страница 111: ...111 International VT 275 V6 Engine NOTES...
Страница 112: ...2005 INTERNATIONAL TRUCK AND ENGINE CORPORATION TMT 120502 PRINTED IN THE U S A...