8
Button-Head
Screws
Mounting
Holes
Bar Nut
Rack Rail
Teeth
9.
Tighten the screws on the rail brackets on each rack rail in the back of the rack.
10.
Extend the rails from the rack until they lock.
11.
With a person on each side, lift the base unit and align the rack rails with the rail guides
mounted on the side of the base unit. Slide the base unit into the rack rails until you hear a
click. Refer to the following figure.
12.
Press the locked rail tabs and slide the base unit completely back into the rack. After the base
unit slides back a few inches, the base unit and rails slide together as a unit into the rack.
Refer to the following figure.
Rail Guide
(Each Side)
Locked Rail Tab
(Each Side)
Rack Rail
(Each Side)
13.
Install the black screws through the handle brackets and the tinnerman nuts you installed in
step 7 to secure the base unit to the rack.
Содержание StudioZ GT
Страница 1: ...GT RAX Systems System Setup April 1999 D1AA00090 ...
Страница 6: ...vi ...
Страница 28: ...18 ...
Страница 78: ...68 ...
Страница 88: ......