
Copyright Innovative Technology GA794-2
Program check procedure
To check settings on a programmed unit:
1.
Power on unit
2.
Click program set button on unit twice (like double click on mouse)
3.
Monitor bezel led and check flash codes
For example
A Pulse interface with 50ms high, 100ms low, 2 pulse per dollar will flash 2,5,10,2
A SSP interface will only ever flash once
A ccTalk interface with 16 bit checksum, no encryption will flash 6,1
A ccTalk interface with 8 bit checksum, no encryption will flash 6,1,2
A Binary interface will flash 8,1
BV20 Operations Manual
38
Содержание BV20
Страница 1: ...Copyright Innovative Technology Ltd 2008 GA794 2 INTELLIGENCE IN VALIDAT BV20 OPERATIONS MANUAL ...
Страница 33: ...Copyright Innovative Technology Ltd 2008 GA794 2 BV20 EXPLODED ASSEMBLY DRAWING NUMBER GA792 ...
Страница 39: ...Copyright Innovative Technology GA794 2 ...
Страница 40: ...Copyright Innovative Technology GA794 2 ...
Страница 41: ...Copyright Innovative Technology GA794 2 ...
Страница 42: ...Copyright Innovative Technology GA794 2 ...